Get Promultifamily project · Seattle, WA
Multifamily Fire Protection, Hvac/Mechanical work permitted February 9, 2026, with 5 permits through February 12, 2026, declaring $27,000 of work. Contractor on record: JN Heating and Cooling LLC.
Design and install a complete fire protection system for the new residential building with two townhouses and two ADUs. Each unit will have its own riser.
Seattle permit records name JN Heating and Cooling LLC and Cascadia Fire Protection as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
5 permits issued Feb 9 – Feb 12, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Dec 19 | #7122022-FS Fire Sprinkler and Suppression · Trade |
Commercial and multifamily, biggest first.
Design and install a complete fire protection system for the new residential building with two townhouses and two ADUs. Each unit will have its own riser.
Status: Issued
| Cascadia Fire Protection |
| $22K |
| applied Feb 11 | #7128720-FR Single-Family/Duplex Furnace · Trade Install 1 outdoor and 1 indoor unit for ADU unit of Building A, TH#7 Status: Issued | JN Heating and Cooling LLC | $5K |
| applied Feb 11 | #7128721-RF Refrigeration · Trade Install 1 system included 1 outdoor and 1 indoor unit for ADU unit for 5046B ( building A ) #TH7 Status: Issued | JN Heating and Cooling LLC | $5K |
| applied Feb 9 | #7128373-RF Refrigeration · Trade Installing 3 minisplit indoor unit and 2 outdoor 24k btu total Please reflect this as Building A Townhouse #7 SFR/ADU Status: Issued | JN Heating and Cooling LLC | $5K |
| applied Feb 9 | #7128376-FR Single-Family/Duplex Furnace · Trade Installing 3 minisplit indoor heads and 2 outdoor unit, bathroom fan, whole house fan, kitchen exhaust, dryer venting, water heater venting. Please reflect this as Building A Townhouse #7 SFR/ADU Status: Issued | JN Heating and Cooling LLC | $5K |