Get ProEvery project in every city · from $79/mo
Get Procommercial project · Seattle, WA
Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical work permitted November 5, 2024, with 19 permits through October 30, 2026, declaring $4,008,819 of work. Contractor on record: Prime Electric.
Change of use from light manufacturing to indoor participant sports per land use code. Construct tenant improvement for Dance School (PN Ballet) at northeast section of 3rd floor of existing commercial building occupy per plan. Mechanical included
Seattle permit records name Prime Electric, Range Electric Company, LLC and Air Systems Engineering as the contractors on this project, among 7 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 3 permits issued in the last 30 days is included with Pro.
See the contractorCommercial and multifamily, biggest first.
19 permits issued Nov 5 – Oct 30, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#7170005-EL Electrical · Electrical Low voltage communications cabling. Status: Issued | Contractor with Pro | — | |
| applied Aug 28 | #7157609-CN Addition/Alteration · Building Install a DC Fast Charging station at existing commercial building parking lot per plan. Status: Issued | Not published | $150K |
| applied Aug 25 | #7159648-EL Electrical · Electrical NORTHWEST FIRE SYSTEMS WILL BE MODIFYING THE EXISTING BUILDING CORE FIRE ALARM SYSTEM FOR TENANT IMPROVEMENTS. A VOICE EVACUATION SUB PANEL WILL BE INSTALLED NEXT TO THE EXISTING FIRE ALARM CONTROL PANEL. THE NEW INSTALLATION WILL INCLUDE THE FOLLOWING. 1. INSTALL VOICE EVACUATION CONTROL PANEL IN… Status: Issued | Contractor with Pro | $28.1K |
| applied Aug 18 | #7158693-RF Refrigeration · Trade Construct tenant improvement for Dance School (PNW Ballet) at northeast section of 3rd floor existing commercial building. Existing VRF outdoor units and branch controllers. Repurposing (3) existing interior branch controllers and (2) existing fan coils. Adding (15) new fan coils. Status: Issued | Auburn Mechanical Inc | $330K |
| applied Jul 30 | #7155607-EL Electrical · Electrical PNB-SODO-School - Job 2002719: Install (1) 200A feeder to provide temp power for (1) 75kVA power skid. Status: Issued | Prime Electric | $8K |
#7156900-EL Electrical · Electrical Low voltage HVAC wiring. Status: Issued | Datskiy Electric LLC | — | |
| applied Jul 6 | #7151261-FS Fire Sprinkler and Suppression · Trade Add sprinklers for new TI walls and ceilings in existing building with existing fire sprinkler system. Status: Issued | Not published | $38.8K |
| applied Jul 9 | #7151592-EL Electrical · Electrical PNB-SODO-School - Job 2002719: THE PROJECT INCLUDES 23,490 GROSS SF INITIAL TENANT IMPROVEMENTS FOR PNB'S SEATTLE SCHOOL. INCLUDES DANCE STUDIOS, DRESSING ROOMS, AND ADMI OFFICES. INSTALLATION OF LIGHTING, LIGHITNG CONTROLS, FA SYSTEMS, ELECTRICAL PANELS AND NEW POWER DEVICES. Site contact: Tim… Status: Issued | Prime Electric | $1.1M |
| applied Jan 15 | #7114323-CN Addition/Alteration · Building Change of use from light manufacturing to indoor participant sports per land use code. Construct tenant improvement for Dance School (PN Ballet) at northeast section of 3rd floor of existing commercial building occupy per plan. Mechanical included Status: Issued | Not published | $2M |
| applied Dec 2 | #7117652-CN Addition/Alteration · Building Tenant improvement to existing warehouse per plan. Status: Completed | Not published | $14.3K |
#7108550-EL Electrical · Electrical Generator Cam-Lock system for existing building. Status: Completed | Range Electric Company, LLC | $25K | |
| applied Apr 3 | #7072975-ME Mechanical · Trade Improve HVAC for new tenant: provide and install (3) New 4 ton VRF air handlers, re-use an existing air handler, new duct arrangements with diffusers, refrigerant piping, and control wiring, per plans. Status: Issued | Not published | $63.3K |
| applied Mar 5 | #7073667-FS Fire Sprinkler and Suppression · Trade TENANT IMPROVEMENT - ADD/RELOCATE FIRE SPRINKLERS FOR T.I. DEMISING WALL. PATRIFP099CF. Status: Completed | Not published | $3.9K |
| applied Mar 26 | #7077464-EL Electrical · Electrical INSTALL A NEW FIRE ALARM POWER SUPPLY AND INSTALL NEW NOTIFICATON DEVICES THROUGHOUT THE TENANT SUITE. Status: Completed | Fire Systems West, Inc. | $4.4K |
#7075471-EL Electrical · Electrical Tenant Improvement: add wiring for (3) new thermostats for the new HVAC fan coils Status: Completed | Air Systems Engineering | $1.6K | |
| applied Mar 14 | #7075466-RF Refrigeration · Trade Tenant Improvement: provide and install (3) 4-ton variable refrigerant flow air handlers to condition storage space Status: Completed | Air Systems Engineering | $6.4K |
#7074741-EL Electrical · Electrical install 200amp 208volt electrical panel. Install misc. receptacles. Connect/power 3 HVAC equipment. Status: Completed | Range Electric Company, LLC | $18K | |
| applied Dec 20 | #6913680-CN Addition/Alteration · Building Construction tenant improvement (improvement of a vacant space for a future tenant not establishing a use at this time) for Industrial building (Track 6) at 4th Floor Suite A occupy per plan. Status: Completed | Not published | $234K |
#7054771-EL Electrical · Electrical (2) new 20A circuits Status: Completed | Exact Electric, LLC | $1K |