Multifamily General Building, Electrical, Fire Protection, Hvac/Mechanical, Sign work permitted January 29, 2026, with 9 permits through September 17, 2026, declaring $444,254 of work. Contractor on record: The Safety Team, Inc..
Initial tenant improvement for a gymnasium (The Little Gym) on the first floor of a mixed-use building occupy per plan. Change of use from general retail sales and services to indoor sports and recreation per land use code. Mechanical included.
Seattle permit records name The Safety Team, Inc., Bay Alarm Company and Berry Sign as the contractors on this project, among 7 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
9 permits issued Jan 29 – Sep 17, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|
#7163066-EL Electrical · Electrical Installing small wireless security system. Panel will be only hardwired device. Remaining devices are all wireless Status: Completed | Bay Alarm Company | — | |
| applied Aug 5 | #7156327-SB Sign, Awning and Canopy · Trade install two non-illum suspended signs under canopy. 8/19/26 SS: Revised plans received from contractor changing orientation of signs. Revised permit fee waived, revised plans approved. Status: Completed | Berry Sign | $4K |
#7154368-EL Electrical · Electrical install 1 ceiling strobe Status: Completed | Froula Alarm Systems, Inc. | — | |
#7150167-EL Electrical · Electrical TI for Little Gym, lights, outlets, required circuits Status: Completed | Mackam, LLC | — | |
| applied Mar 17 | #7128233-CN Addition/Alteration · Building Initial tenant improvement for a gymnasium (The Little Gym) on the first floor of a mixed-use building occupy per plan. Change of use from general retail sales and services to indoor sports and recreation per land use code. Mechanical included. Status: Completed | Not published | $438K |
#7132925-FS Fire Sprinkler and Suppression · Trade ADD TWO (2) SPRINKLER HEADS Status: Completed | The Safety Team, Inc. | $2K | |
#7132929-EL Electrical · Electrical ADD TWO (2) VISUAL FIRE ALARM DEVICES Status: Completed | The Safety Team, Inc. | — | |
| applied Feb 20 | #7129708-RF Refrigeration · Trade Install (3) roofttop heat pump split systems, air handlers, bathroom venting, ductwork, and fresh air systems Status: Completed | Evergreen State Heat and AC | $2K |
#7127196-EL Electrical · Electrical We are installing a 200A 3ph 120/208y main lug subpanel on previously installed (per previous permit) feeders. connecting existing feeders to the panel for 3 (three) 5-ton HVAC units and extending those feeders to the new HVAC units, installing and connecting 2 circuits for point-of-use water… Status: Completed | Paladin Electric, LLC | — |