Multifamily General Building, Electrical, Hvac/Mechanical work permitted April 17, 2025, with 9 permits through August 31, 2026, declaring $1,122,406 of work. Contractor on record: Kirby Electric Incorporated.
Remodel of second floor offices into three apartment units. 9/1/2026 jnl renewal
Seattle permit records name Kirby Electric Incorporated, Air Systems Engineering Inc and Canyon Electric as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
9 permits issued Apr 17 – Aug 31, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#7160437-CN Addition/Alteration · Building Vehicle Impact Repair to an existing Commercial Building subject to field inspection STFI. Status: Issued |
| Not published |
| $23.3K |
| applied Jan 22 | #7125546-EL Electrical · Electrical Modification of existing fire alarm system. Tenant improvement of level 2 residential level. We will utilize spare NAC circuit on existing SK-6808 fire alarm control panel for Tenant Improvement notification. Provide 7 Low frequency sounder notification appliances and 1 horn strobe notification… Status: Issued | Kirby Electric | $13.7K |
| applied Feb 6 | #7128312-CN Addition/Alteration · Building Construct in-kind repairs to water-damaged building subject to field inspection (STFI). Status: Issued | Not published | $125K |
| applied Jan 22 | #7125932-RF Refrigeration · Trade Installing (3) new multizone Heat Pumps, with a total of (7) new Ceiling Cassett Fan Coils, and new refrigeration piping Status: Issued | Air Systems Engineering Inc | $105K |
#7125921-EL Electrical · Electrical Status: Issued | Air Systems Engineering Inc | — |
#7123419-EL Electrical · Electrical Status: Issued | Kirby Electric Incorporated | — |
| applied Aug 26 | #7102352-ME Mechanical · Trade Remodel of the 2nd story of existing mixed use building. Status: Issued | Not published | $65K |
| applied Aug 20 | #7102420-EL Electrical · Electrical Remodel of second floor offices into three apartment units. 9/1/2026 jnl renewal Status: Issued | Canyon Electric | $590K |
| applied Jan 17 | #7028921-CN Addition/Alteration · Building Construct alterations to a mixed use building to add multiple dwelling units occupy per plans Status: Issued | Sean Steichen | $200K |