Get ProEvery project in every city · from $79/mo
Get Procommercial project · Seattle, WA
Commercial Electrical, Fire Protection work permitted February 4, 2025, with 4 permits through August 27, 2026, declaring $192,706 of work. Contractor on record: Point Monitor Corp.
Relocate existing panel, run power for new shop equipment and dust collector
Seattle permit records name Point Monitor Corp, Columbia Fire and Datskiy Electric LLC as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
4 permits issued Feb 4 – Aug 27, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 12 | #7157781-EL |
Commercial and multifamily, biggest first.
Electrical · Electrical
This is a joint venture w/ SHJ Electric to install a new Dedicated Function Fire Alarm/Sprinkler Monitoring System. 3 Sprinkler Riser Rooms, pull station and waterflow bell at each riser room. No occupant notification in the building, other than a single horn/strobe at the FACP.
Status: Completed
| Point Monitor Corp |
| $22.5K |
| applied Mar 18 | #7075951-FS Fire Sprinkler and Suppression · Trade 1) Modify the existing fire sprinkler system to accommodate the new walls and ceilings (11 sprinklers) 2) Add new sprinklers and drains to new duct work carrying sawdust (5 sprinklers). renewal NDM 10/19/26 Status: Issued | Columbia Fire | $13.7K |
#7082144-EL Electrical · Electrical Factory controls installation, and BMS integation Status: Completed | Datskiy Electric LLC | $6.5K |
#7068730-EL Electrical · Electrical Relocate existing panel, run power for new shop equipment and dust collector Status: Completed | Not published | $150K |
In Seattle, biggest first.