Commercial Electrical work permitted September 2, 2025, with 7 permits through September 2, 2026, declaring $56,511 of work. Contractor on record: Cochran, Inc..
Installing (14) Cat 6 Cables, (1) 12 strand Fiber, and (1) 22/4 Cable
Seattle permit records name Cochran, Inc. as the contractor on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
7 permits issued Sep 2 – Sep 2, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#7161061-EL Electrical · Electrical 86497 - Install (1) new dedicated circuit Status: Completed | Cochran, Inc. | — | |
Commercial and multifamily, biggest first.
#7159909-EL Electrical · Electrical 42728 PERFORM GENERATOR LOAD BAK Status: Issued |
| Not published |
| — |
#7119389-EL Electrical · Electrical PERFORM LOAD BANK ON STANDBY GENERATOR Status: Completed | Not published | $500 |
#7117146-EL Electrical · Electrical Installation of 1 Control Panel and 2 Access Control Doors Status: Completed | Cochran Inc | $18.7K |
#7116945-EL Electrical · Electrical Installing (14) Cat 6 Cables, (1) 12 strand Fiber, and (1) 22/4 Cable Status: Completed | Cochran, Inc. | $35K |
#7115981-EL Electrical · Electrical 528759 - Install sleeves through, up to (4) cinderblock walls bonded with #6 wire, install new circuit for IDF, install an electrical connection for Access Control System. Status: Completed | Cochran, Inc. | $2.3K |
#7104474-EL Electrical · Electrical PERFORM GENERATOR LOAD BANK Status: Completed | Not published | $500 |
In Seattle, biggest first.