Multifamily Hvac/Mechanical work permitted November 12, 2024, with 2 permits through November 12, 2024, declaring $26,850 of work. Contractor on record: Western Mechanical.
Supply all tools and labor to disconnect water, venting and power from the existing tankless water heater and replace the two old units with new ASME code stamped water heaters. Supply all tolls and labor to disassemble and dispose water heaters by EPA standards. Correction Item #3 MRHL Supply and install 3 new High temperature limit switches. Supply all tools and labor to reconnect water, electricity and venting to the new water heater Correction Item #6 Vent existing gas regulator to
Seattle permit records name Western Mechanical as the contractor on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
2 permits issued Nov 12 – Nov 12, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#7054283-BP Boiler/Pressure Vessel · Trade Supply all tools and labor to disconnect water, venting and power from the existing tankless water heater and replace the two old units with new ASME code stamped water heaters. Supply all tolls and labor to disassemble and dispose water heaters by EPA standards. Correction Item #3 MRHL Supply… |
Commercial and multifamily, biggest first.
Status: Completed
| Western Mechanical |
| $26.9K |
#7054284-BP Boiler/Pressure Vessel · Trade Supply all tools and labor to disconnect water, venting and power from the existing tankless water heater and replace the two old units with new ASME code stamped water heaters. Supply all tolls and labor to disassemble and dispose water heaters by EPA standards. Correction Item #3 MRHL Supply… Status: Completed | Western Mechanical | $26.9K |