Get ProEvery project in every city · from $79/mo
Get Procommercial project · Seattle, WA
Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical work permitted February 7, 2025, with 11 permits through April 20, 2026, declaring $1,041,502 of work. Contractor on record: Evergreen Power Systems, Inc.
Construct tenant improvements for office on 3rd floor of existing commercial building occupy
Seattle permit records name Evergreen Power Systems, Inc, EC Electric and Macdonald Miller Facility Solutions LLC as the contractors on this project, among 7 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
11 permits issued Feb 7 – Apr 20, newest first.
| Issued | Permit | Contractor |
|---|
Commercial and multifamily, biggest first.
| Value |
|---|
#7139264-EL Electrical · Electrical Installing (9) new CCTV devices, two of which are replacements to existing. EC job #836803. Status: Completed | EC Electric | — | |
#7137155-EL Electrical · Electrical Installation of two low voltage LED lighting units with associated power supply, photocell and 2 amp circuit breaker in existing junction box in the underside of shelter platform roof structure Status: Completed | Not published | — | |
#7125846-EL Electrical · Electrical Status: Completed | Not published | — | |
| applied Nov 6 | #7113577-ME Mechanical · Trade HVAC demo work and replacement for levels 3-4 and MR, per plans Status: Completed | Macdonald Miller Facility Solutions LLC | $153K |
#7123954-EL Electrical · Electrical Status: Completed | Static Energy, Inc | — | |
| applied Nov 20 | #7117768-EL Electrical · Electrical We are relocating (18) existing ceiling speaker-strobes, demoing (22) existing ceiling strobes, demoing (4) existing ceiling speaker-strobes, and demoing (1) duct detector on the fourth floor in the IDF/server room. We are performing this work as a joint venture with Evergreen Power Systems Inc. Status: Completed | Evergreen Power Systems | $18.4K |
| applied Oct 21 | #7112753-FS Fire Sprinkler and Suppression · Trade TENANT IMPROVEMENT - add and relocate sprinklers for TI wall and ceilings Status: Completed | Patriot Fire Protection Inc | $14.5K |
#7111633-EL Electrical · Electrical 20549 - Westlake - add/alter lighting. [C.Kenefick 12/22/2025 - Six dedicated 30a circuits added to permit.] Status: Completed | Evergreen Power Systems, Inc | $40K | |
#7109880-EL Electrical · Electrical Disconnection of old and connection to three (3) new cash wrap locations. No added load or new circuits required. Status: Completed | Teknon Electrical Services | $11K | |
| applied Mar 28 | #7068952-CN Addition/Alteration · Building Construct tenant improvements for office on 3rd floor of existing commercial building occupy Status: Completed | Not published | $800K |
#7069489-EL Electrical · Electrical Installation of a Wireless intrusion system utilizing the DMP platform with DMP wireless translator for the 5800 devices. Replace the Inovonics wireless devices with DMP wireless. Replace the Ademco head end and keypad with a new DMP burg system. Status: Completed | Everon LLC | $5K |
In Seattle, biggest first.