Commercial Electrical, Hvac/Mechanical work permitted December 16, 2024, with 10 permits through July 10, 2026, declaring $160,697 of work. Contractor on record: Prime Electric.
24385 SAS READER ADD EC will install readers and electrified door hardware in the following locations. FL1 Main Entry, FL1 Reception, FL1 Rear Lobby, FL2 Street Entry and FL2 Clinic Entry EC will install a REX and Door Contact to the door at each door. EC and Prime will furnish and install ACS composite cable from the reader to the IDF Room on the 2nd floor. EC will provide and install an AMAG 8 Door Control package with power supply to support the system. EC will terminate on AMAG panel.
Seattle permit records name Prime Electric, Sequoyah Electric LLC and Entrance Controls Inc as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
10 permits issued Dec 16 – Jul 10, newest first.
| Issued | Permit |
|---|
Commercial and multifamily, biggest first.
| Contractor |
|---|
| Value |
|---|
#7152413-EL Electrical · Electrical 42373 PERFOR LOAD BANK Status: Completed | Not published | — | |
#7152131-EL Electrical · Electrical 26030 - SAS UPPER LEVEL CAMERA - INSTALL A CAMERA Status: Issued | Entrance Controls Inc | — | |
#7143863-EL Electrical · Electrical LV Cable for door controller Status: Issued | Prime Electric | — | |
#7130293-EL Electrical · Electrical Seattle Animal Shelter- Job #1025737, Running Cat6 cable for camera, 2061 15th Ave W. Site Contact: Mark Perotti 425-864-5731 Status: Completed | Prime Electric | — | |
#7129273-EL Electrical · Electrical Install (2) 50A circuits for two (2) detached sheds. Install (1) GFCI outlet, (1) light fixture, and (1) switch in each shed. Install disconnect in each for mini split unit. - SEQ #306469 Status: Completed | Sequoyah Electric LLC | — | |
| applied Aug 12 | #7094651-ME Mechanical · Trade Alterations to mechanical system on existing commercial building, per plans. Status: Issued | Key Mechanical Company | $5.5K |
| applied May 23 | #7087317-EL Electrical · Electrical We are replacing the main distribution panel in the Seattle animal shelter. The panel has 5 breakers that feeds electrical panels. MDP is rated @ 208/120V 3phase-4wire 600A [6/3/25 KEF - Plan set approved. EC assigned.] [ Permit extended out to 05/21/2027 by PJR 06/04/2026.] Status: Issued | Sequoyah Electric LLC | $30K |
#7083274-EL Electrical · Electrical 24385 SAS READER ADD EC will install readers and electrified door hardware in the following locations. FL1 Main Entry, FL1 Reception, FL1 Rear Lobby, FL2 Street Entry and FL2 Clinic Entry EC will install a REX and Door Contact to the door at each door. EC and Prime will furnish and install ACS… Status: Completed | Entrance Controls Inc | $60.2K | |
| applied Jan 29 | #7067532-EL Electrical · Electrical This is an emergency project to replace a failed main disconnect switch. The rating on the switch is 600A, therefore requiring plan review. SCL coordination has taken place. [01/30/25 BGO - Approved Plan Set] Status: Completed | Sequoyah Electric LLC | $50K |
#7061189-EL Electrical · Electrical Extend 120v power to new access control panel and power supply. Extend access control cabling to (7) doors. In conjunction with Entrance Controls ENTRACI933PZ. JOB 1021861 Contact John Henderson 425-864-5750 Status: Completed | Prime Electric | $15K |