Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Seattle, WA
Multifamily Electrical, Elevator, Hvac/Mechanical work permitted March 21, 2025, with 5 permits through July 8, 2025, declaring $253,088 of work. Contractor on record: 16d LLC.
New controller w/battery lowering, power unit, MR shutoff, pit shutoff, rupture valve, vics as needed (retain oil line), paint MR floor, paint pit, paint pit channels and buffers, HW access, fixtures, COP riding lantern, cartop inspection station, cartop lighting, alarm bell, packing, pit ladder, restrictor, 3D edge, car track, hangers, hall door rollers, interlocks, pickups, spirators, gibs and fire tabs as needed, annunciator, intercom, phone, VAM unit, emergency light, braille, car ID tags
Seattle permit records name 16d LLC and ELTEC Systems LLC as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
5 permits issued Mar 21 – Jul 8, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
| applied Jun 25 | #7078991-ME Mechanical · Trade For the purpose of elevator modernization: Install split unit in existing elevator machine room and nearby outdoor space, per plans. Status: Completed | Not published | $9.7K |
| applied Apr 10 | #7080031-EL Electrical · Electrical For the purpose of elevator modernization: Replace FA panel and install detection in machine room, on each of four elevator landings, and at the FA panel. Install relays in the elevator machine room for recall and hat. Status: Completed | 16d LLC | $13.3K |
| applied Apr 4 | #7078994-RF Refrigeration · Trade For the purpose of elevator modernization: Refrigeration permit for 7078991-ME Status: Completed | 16d LLC | $9.7K |
#7077004-EL Electrical · Electrical Electrical for elevator modernization Status: Completed | 16d LLC | $11.2K |
| applied Mar 21 | #7076595-CY Conveyance · Trade New controller w/battery lowering, power unit, MR shutoff, pit shutoff, rupture valve, vics as needed (retain oil line), paint MR floor, paint pit, paint pit channels and buffers, HW access, fixtures, COP riding lantern, cartop inspection station, cartop lighting, alarm bell, packing, pit ladder,… Status: Completed | ELTEC Systems LLC | $219K |
In Seattle, biggest first.