Multifamily General Building, Electrical, Elevator, Fire Protection, Hvac/Mechanical, Sign work permitted April 10, 2025, with 15 permits through June 16, 2026, declaring $14,454,163 of work. Contractor on record: Otis Elevator Company.
Change of use from Office/Commercial use to residential use per land use code. Construct substantial alterations and upper level addition to convert commercial office building to multi-family residential building occupy per plan. Mechanical included.
Seattle permit records name Otis Elevator Company, Emerald Aire, Inc. and Fire Protection Inc as the contractors on this project, among 8 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
15 permits issued Apr 10 – Jun 16, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jun 16 | #7147179-SB Sign, Awning and Canopy · Trade 1) Exterior Non Illuminated Wall Sign Status: Completed | Vertical Visual Solutions | $4K |
| applied Apr 13 | #7136328-CN Addition/Alteration · Building Construct alterations to existing commercial building at rooftop per plan. Status: Completed | Not published | $41.4K |
| applied Feb 9 | #7128410-EL Electrical · Electrical 50.0 kW Roof Mounted Solar Array [3/9/2026 BGO - Approved PV Plan Set] Status: Completed | Ellensburg Solar LLC | $82K |
| applied Jan 8 | #7123492-CY Conveyance · Trade Installation of traction unit N1JX40 - Elevator #2 6987880-CN (Construction Permit) 2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1 Status: Completed | Otis Elevator Company | $189K |
| applied Jan 8 | #7123493-CY Conveyance · Trade Installation of traction unit N1JX41 - Elevator #1 6987880-CN (Construction Permit) 2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1 Status: Completed | Otis Elevator Company | $191K |
#7121615-EL Electrical · Electrical Provide and install (11) communication wires for ERVs on Level 5. Status: Completed | Emerald Aire, Inc. | $1.6K | |
| applied Dec 16 | #7121286-RF Refrigeration · Trade Provide and install (97) outdoor heat pumps and associated piping. mechanical permit 6987880-CN Status: Completed | Emerald Aire, Inc. | $175K |
| applied Jul 21 | #7096978-FS Fire Sprinkler and Suppression · Trade INSTALLATION OF NEW WET SPRINKLER SYSTEMS AND MODIFICATIONS TO THE EXISTING STANDPIPE AND PARKING GARAGE DRY SYSTEMS, DESIGNED AND INSTALLED IN ACCORDANCE WITH 2019 NFPA 13, 14, 20, 2021 IFC & IBC AS WELL AS LOCAL JURISDICTION SPECIFICATIONS/GUIDELINES. Status: Completed | Not published | $279K |
#7119970-EL Electrical · Electrical INSTALLATION OF A LOW VOLTAGE ACCESS CONTROL SYSTEM, A CCTV SYSTEM, AND A ELEVATOR LOBBY 2-WAY COMMUNICATION SYSTEM. Status: Completed | Fire Protection Inc | $15K | |
| applied Jul 10 | #7095194-EL Electrical · Electrical Existing Office building conversion to Residential 74-unit building. Entire building new electrical system installed including 74 new residential units with data. 2800A, 208Y/120V, 3PH new primary underground service provided to existing in building utility vault by Seattle City Light. Status: Completed | Exact Electric, LLC | $1.4M |
| applied Oct 1 | #7109417-EL Electrical · Electrical INSTALLATION OF A FIRE ALARM SYSTEM IN A FULLY SPRINKLERED EXISTING SEVEN-STORY BUILDING UNDERGOING SUBSTANTIAL ALTERATION AND CHANGE OF USE FROM OFFICE TO RESIDENTIAL (R-2). AN ADDRESSABLE FIRE ALARM CONTROL PANEL WILL BE INSTALLED IN THE FIRE SPRINKLER RISER ROOM LOCATED ON LEVEL P2. A REMOTE… Status: Completed | Fire Protection Inc | $60K |
#7097518-EL Electrical · Electrical 200A overhead Temp Service Status: Completed | Exact Electric, LLC | $10K | |
| applied Aug 7 | #6987880-CN Addition/Alteration · Building Change of use from Office/Commercial use to residential use per land use code. Construct substantial alterations and upper level addition to convert commercial office building to multi-family residential building occupy per plan. Mechanical included. Status: Completed | Compass Construction | $12M |
| applied Apr 10 | #7012552-CY Conveyance · Trade DECOMMISSION Hydro Car 1 - removal / demolition of hydraulic elevator to provide a machine room and blank hoist way to install new conveyance equipment EQP-SI-04211 / EQP-CY-00593 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Artline | $55.6K |
| applied Apr 10 | #7012553-CY Conveyance · Trade DECOMMISSION Hydro Car 2 - removal / demolition of hydraulic elevator to provide a machine room and blank hoist way to install new conveyance equipment EQP-SI-04211 / EQP-CY-00594 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Artline | $55.6K |
In Seattle, biggest first.