Commercial Electrical, Elevator, Fire Protection, Hvac/Mechanical work permitted August 13, 2025, with 7 permits through June 15, 2026, declaring $131,423 of work. Contractor on record: Prime Electric.
alteration to controller, toe guard, battery lowering, power unit ep-215, ld-16 door operator, 3d door edge, cop, car and hall fixtures, pit ladder, hoistway access, selector. EQP-SI-06674 / EQP-CY-05131 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1)
Seattle permit records name Prime Electric, Resicon LLC and AAA Fire Protection as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
7 permits issued Aug 13 – Jun 15, newest first.
| Issued | Permit |
|---|
Commercial and multifamily, biggest first.
| Contractor |
|---|
| Value |
|---|
| applied Jun 15 | #7148013-RF Refrigeration · Trade Elevator Rm DHP McKinney Manor Apts Status: Completed | Resicon LLC | $5K |
| applied Apr 23 | #7132802-ME Mechanical · Trade Install a single zone wall unit heat pump for the elevator equipment room located in the parking garage, per plans. Status: Completed | Not published | $7.5K |
#7135995-EL Electrical · Electrical BK25140 Elevator Power Upgrade- Job #1024375, Relocate existing 100A elevator panel into elevator equipment room and install new 100A disconnect. Relocate existing (2) 20A circuits (including air pressurization) to adjacent panel. Relocate one fire alarm device. Provide and install new branch… Status: Completed | Prime Electric | — | |
#7133331-FS Fire Sprinkler and Suppression · Trade Provide labor and materials to temporarily remove one upright sprinkler located in the elevator pit and one upright sprinkler located in the elevator machine room. The piping will be made safe following removal of the sprinklers. At a later date, AAA Fire Protection will return to reinstall the… Status: Issued | Not published | $2.5K | |
#7126251-EL Electrical · Electrical Status: Issued | AAA Fire Protection | — | |
#7112312-EL Electrical · Electrical Mckinney Manor, Job #1024375; Provide new breaker and disconnect for upgraded elevator equipment, Basement Electrical Room - 1 Flr down from lobby. Site Contact: Oleg Nadykto (425) 941-8828 Status: Completed | Prime Electric | $15K | |
| applied Aug 13 | #7101288-CY Conveyance · Trade alteration to controller, toe guard, battery lowering, power unit ep-215, ld-16 door operator, 3d door edge, cop, car and hall fixtures, pit ladder, hoistway access, selector. EQP-SI-06674 / EQP-CY-05131 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Issued | TK Elevator | $101K |