Get Procommercial project · Seattle, WA
Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical work permitted November 7, 2024, with 10 permits through October 30, 2025, declaring $92,584 of work. Contractor on record: Emerald Aire, Inc..
Wire New space for Summit Community Center per lighting plans and current codes. o Includes install of 200A 120/208V 3phase Copper feeders from electrical room? ? Wiring routed through existing conduits Relocate panel to be outside of the bathroom per code Includes circuit and connection to HVAC system o (1) indoor unit 50A single phase 208V max o (1) outdoor heat pump/AC 30A single phase 208V max Includes Supply & Install of lighting fixtures Includes show window receptacles and c
Seattle permit records name Emerald Aire, Inc., Garner Electric Washington LLC and Cosco Fire Protection as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
10 permits issued Nov 7 – Oct 30, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#7114460-EL Electrical · Electrical Additional Electrical work - add 2 lights and move two lights Status: Completed | Garner Electric Washington LLC | $2.5K | |
| applied Sep 4 | #7098290-ME Mechanical · Trade Tenant improvement with new HVAC including ducted heat pump, DOAS system, controls and commissioning per plans. Status: Completed | Emerald Aire, Inc. | $26.9K |
| applied Aug 11 | #7100635-FS Fire Sprinkler and Suppression · Trade adding 9 pendents with space due to new walls and ceilings Status: Completed | Not published | $11.8K |
#7101572-EL Electrical · Electrical This TI is the addition of one strobe in restroom of gym in existing building. Status: Completed | Cosco Fire Protection | $600 | |
| applied Jul 29 | #7098652-RF Refrigeration · Trade Provide and install (1) 5-ton outdoor heat pump and associated refrigeration piping. Status: Completed | Emerald Aire, Inc. | $7.5K |
#7098587-EL Electrical · Electrical Wire New space for Summit Community Center per lighting plans and current codes. o Includes install of 200A 120/208V 3phase Copper feeders from electrical room? ? Wiring routed through existing conduits Relocate panel to be outside of the bathroom per code Includes circuit and connection to… Status: Completed | Garner Electric Washington LLC | $32.5K | |
#7098656-EL Electrical · Electrical Provide and install (2) low voltage thermostats and associated wiring. Status: Completed | Emerald Aire, Inc. | $350 | |
| applied Mar 18 | #7074580-CN Addition/Alteration · Building Change use from retail to sports and recreation indoor per land use code. Construct alterations and add bathroom for SE Tenant space (Summit Gym) and occupy per plans. Status: Completed | Not published | $7.5K |
| applied Oct 21 | #7052226-EL Electrical · Electrical INSTALL NEW INPUT MODULE TO MONITOR KITCHEN HOOD . INSTALL NEW INPUT MODULE TO MONITOR DUCT SMOKE DETECTOR. Status: Completed | Fire Systems West, Inc. | $4.5K |
| applied Oct 18 | #7051558-FS Fire Sprinkler and Suppression · Trade Add and relocate existing fire sprinkler coverage for new walls and ceilings. Status: Completed | Not published | $6K |
In Seattle, biggest first.