Commercial Electrical, Elevator, Hvac/Mechanical work permitted December 13, 2024, with 9 permits through May 6, 2026, declaring $181,725 of work. Contractor on record: Prime Electric.
Replace failed 2000amp feeder circuit to sub-basement MDP. JOB 1021891 Contact: Justin Milestone 425-531-9327 [1-24-25 DR - No ESS per contractor, I removed the check on ESS for the contractor]
Seattle permit records name Prime Electric, UMC, Inc. and Digital Tech Group,llc as the contractors on this project, among 6 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
9 permits issued Dec 13 – May 6, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#7141937-EL Electrical · Electrical replacing and an analog camera system and installing 21 camera's some existing and some new, 1 nvr and 2 poe horn stroves. camera will be in sub basement, basement, main floor, 2nd floor. Status: Completed |
| Digital Tech Group,llc |
| — |
| applied Nov 18 | #7103158-ME Mechanical · Trade Replacing a split unit STFI (Subject to Field Inspection) Status: Completed | UMC, Inc. | $7K |
#7116913-EL Electrical · Electrical Install (2) Relays in the Elevator Machine Room and (1) Smoke Detector at the Basement Elevator Lobby. Status: Issued | Seacom Cabling Inc | $6K |
| applied Oct 22 | #7112414-CY Conveyance · Trade Remove/Replace flooring, wall panels, and lighting EQP-SI-06044 / EQP-CY-04036 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | Elevations Ltd | $19.7K |
| applied Aug 22 | #7103168-RF Refrigeration · Trade Replacement of a split unit Status: Completed | UMC, Inc. | $7K |
| applied Jan 24 | #7067059-EL Electrical · Electrical Replace failed 2000amp feeder circuit to sub-basement MDP. JOB 1021891 Contact: Justin Milestone 425-531-9327 [1-24-25 DR - No ESS per contractor, I removed the check on ESS for the contractor] Status: Completed | Prime Electric | $120K |
| applied Jan 21 | #7063360-CY Conveyance · Trade Modernization to upgrade Controller, Fixtures, Machine, Hoistway Wiring EQP-SI-06044 / EQP-CY-04036 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Completed | Fujitec America | $25K |
#7064208-EL Electrical · Electrical Add (2) new strip lights in basement. Replace (4) existing fixtures with LED. JOB 1021918 Contact Justin Milestone 425-531-9327 Status: Completed | Prime Electric | $1.5K |
#7060975-EL Electrical · Electrical Temporary emergency repair. Temp power 320KW 1200A Generator JOB 1021891 Derek Robinson 425-429-0411 Status: Completed | Prime Electric | $2.5K |