Get ProEvery project in every city · from $79/mo
Get Procommercial project · Seattle, WA
Commercial Electrical, Elevator work permitted March 12, 2025, with 5 permits through May 16, 2025, declaring $121,179 of work. Contractor on record: Mobility Concepts Inc.
New installation of Garaventa Shaftway Commercial VPL 7007429-CN (Original Construction Permit) (2018 SBC/SEBC=2020 SEC=2019 A17.1=2017 A18.1)
Seattle permit records name Mobility Concepts Inc and Seacom Cabling Inc as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
5 permits issued Mar 12 – May 16, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied May 16 | #7086015-CY Conveyance · Trade New installation of Garaventa Shaftway Commercial VPL 7007429-CN (Original Construction Permit) (2018 SBC/SEBC=2020 SEC=2019 A17.1=2017 A18.1) |
Commercial and multifamily, biggest first.
Status: Completed
| Mobility Concepts Inc |
| $39.3K |
#7086301-EL Electrical · Electrical Prewire for Access Control and CCTV Status: Completed | Seacom Cabling Inc | $5K |
#7082600-EL Electrical · Electrical Removing (2) existing electrical panels. Locations are in the Kitchen and the Second Floor. Installing (1) new 200-Amp load center panel in each location. Status: Completed | Not published | $14K |
| applied Mar 13 | #7075224-EL Electrical · Electrical Replacing Like-In-Kind electrical service 1phase 400-amp [3/13/25 KEF - Plan set approved] Status: Completed | Not published | $31K |
#7075112-EL Electrical · Electrical Entry renovation to make ADA accessible. Installing a verticle lift platform, new lighting, and outdoor outlets. Service replacement. Status: Completed | Not published | $31.9K |
In Seattle, biggest first.