Commercial General Building, Electrical, Fire Protection work permitted December 13, 2024, with 6 permits through February 13, 2026, declaring $567,841 of work. Contractor on record: Johnson Controls Fire Protection.
SPU is replacing the two existing trash compactors with new ones. The replacement compactors are electrically larger in size, but calculations supplied show that existing compactor switchboard has enough capacity for the large new compactors.
Seattle permit records name Johnson Controls Fire Protection, Sequoyah Electric LLC and Vector Electrical Group as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
6 permits issued Dec 13 – Feb 13, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
#7129227-EL Electrical · Electrical Add (1) New 60A 480V circuit to equipment - SEQ #7316996 Status: Completed | Sequoyah Electric LLC | — | |
| applied Jun 10 | #7082816-CN Addition/Alteration · Building Construct alterations to existing commercial building (North Transfer Station) per plan. Construct alterations to 2 existing commercial buildings (North Transfer Station and Recycling Building) per plan. review and process for 2 records under 7082816-CN. Status: Issued | Not published | $200K |
| applied Jun 2 | #7088925-FS Fire Sprinkler and Suppression · Trade Demo existing 1-1/2" line under existing/old compactor. Re-install new 1-1/2" pipe under new compactor. Re-use existing 1-1/2" grooved outlet off existing 4" main. Drop down to under new compactor. Re-install 1" aux drain with drum drip. Re-use existing strut supports and add additional strut… Status: Completed | Johnson Controls Fire Protection | $19.7K |
| applied Jun 2 | #7088926-FS Fire Sprinkler and Suppression · Trade Demo existing 1-1/2" line under existing/old compactor. Re-install new 1-1/2" pipe under new compactor. Re-use existing 1-1/2" grooved outlet off existing 4" main. Drop down to under new compactor. Re-install 1" aux drain with drum drip. Re-use existing strut supports and add additional strut… Status: Completed | Johnson Controls Fire Protection | $18.2K |
| applied Aug 5 | #7037137-CN Addition/Alteration · Building Tenant improvements to replace (two) trash compactors in existing industrial building (SPU) per plan. Status: Issued | Not published | $80K |
| applied Mar 25 | #7015557-EL Electrical · Electrical SPU is replacing the two existing trash compactors with new ones. The replacement compactors are electrically larger in size, but calculations supplied show that existing compactor switchboard has enough capacity for the large new compactors. Status: Completed | Vector Electrical Group | $250K |
In Seattle, biggest first.