Commercial Electrical, Hvac/Mechanical work permitted March 25, 2025, with 6 permits through October 13, 2026, declaring $511,550 of work. Contractor on record: M.C. Dean, Inc..
Modify existing rooftop unit (AHU-LP-5.1) to incorporate a new humidifier and dispersion array into a space previously designed to accept this equipment. A reverse osmosis system will be located in a janitor storage closet on 11th floor below the air handler which will provide clean water to the humidifier. Monitoring devices are being provided on level 5 outside the operation rooms to display temperature, room pressure and humidity levels of each operating room. No mechanical changes occurr
Seattle permit records name M.C. Dean, Inc., EC Electric and Pacific Power Group as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 1 permit issued in the last 30 days is included with Pro.
See the contractorCommercial and multifamily, biggest first.
6 permits issued Mar 25 – Oct 13, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Apr 22 | #7139504-EL Electrical · Electrical The existing XLS1000 Fire Alarm Control Unit has been obsolete for a number of years now and replacement parts are no longer manufacturered and also no longer available to purchase. All existing field devices are to remain as currently installed under the scope of this project. Only the control… Status: Issued | Contractor with Pro | $200K |
#7158418-EL Electrical · Electrical Battery Replacement in UPS room on 1st floor. Qty: (40) - Model: HR1251W2FR or equivalent. Status: Issued | M.C. Dean, Inc. | — | |
#7120814-EL Electrical · Electrical Repalce controller cards, re-work wall assemblies. EC job #836601. Status: Issued | EC Electric | $8K | |
#7113614-EL Electrical · Electrical Maintenance for End-of-life parts in existing UPS system, to include: fan module, a bridge board, and AC capacitors. 07 Maintenance work performed by trained UPS technicians. Zavtek is a licensed 07 Electrical contractor performing 07 electrical work. Worked with Inspector Jeff Chriest for this… Status: Closed | Not published | $2K | |
#7091846-EL Electrical · Electrical LOAD BANK TESTING ON ELECTRIC BACK UP GENERATOR - SR00113946 Status: Completed | Pacific Power Group | $450 | |
| applied Feb 27 | #7068453-ME Mechanical · Trade Modify existing rooftop unit (AHU-LP-5.1) to incorporate a new humidifier and dispersion array into a space previously designed to accept this equipment. A reverse osmosis system will be located in a janitor storage closet on 11th floor below the air handler which will provide clean water to the… Status: Completed | McKinstry Co LLC | $301K |