Get Procommercial project · Seattle, WA
Commercial General Building, Electrical, Elevator, Fire Protection work permitted December 16, 2024, with 9 permits through March 20, 2026, declaring $630,930 of work. Contractor on record: Prime Electric.
Construct interior non-structural alterations at 1st floor dining bistro and fitness areas of institutional/residential building [Mary Schwartz Summit] subject to field inspection [STFI].
Seattle permit records name Prime Electric, Valley Electric Co. Of Mount Vernon Inc and Artline as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
9 permits issued Dec 16 – Mar 20, newest first.
| Issued | Permit |
|---|
Commercial and multifamily, biggest first.
| Contractor |
|---|
| Value |
|---|
#7134359-FS Fire Sprinkler and Suppression · Trade Relocating / adding 5 pendents in fitness room Status: Completed | Not published | $14.8K | |
| applied Oct 17 | #7112215-CY Conveyance · Trade supply and install our hydroenhance upgrade to replace current control board. including door edge and door operator EQP-SI-06924 / EQP-CY-05615 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Issued | Artline | $56.3K |
| applied Sep 3 | #7104724-FS Fire Sprinkler and Suppression · Trade adding and relocating pendants for new walls and ceilings in the ding room, bistro, and fitness room Status: Completed | Not published | $14.8K |
#7105685-EL Electrical · Electrical ITN will install 5000 ft of CAT 5e plenum cable for cameras. They will terminate at one 24 port patch panel. . Status: Completed | Interface Technologies Northwest | $5K | |
#7105633-EL Electrical · Electrical Kline Galland Mary Schwartz - Job 1023996: Fitness Room - Demo (6) existing wall outlets. Provide and install (4) double duplex wall outlets and (1) floor box outlet. Demo (31) existing light fixtures. Provide and install (27) light fixtures controlled using existing switches. Site contact: George… Status: Completed | Prime Electric | $22.1K | |
#7105611-EL Electrical · Electrical Kline Galland Mary Schwartz - Job 1023996: Dining Room: Remove and replace (15) duplex wall outlets.Remove (50) existing light fixtures and install (65) new light fixtures using erxistig switches. Remove and reinstall fire alarm devices for fire alarm rough-in. Remove existing ceiling mounted… Status: Completed | Prime Electric | $68.7K | |
| applied Jun 11 | #7090791-CN Addition/Alteration · Building Construct interior non-structural alterations at 1st floor dining bistro and fitness areas of institutional/residential building [Mary Schwartz Summit] subject to field inspection [STFI]. Status: Completed | Not published | $460K |
#7061826-EL Electrical · Electrical TI - Wall Modification. After wall is open (1) existing Fire Alarm device will be remounted after wall is reconfigured Status: Completed | Valley Electric Co. Of Mount Vernon Inc | $4K | |
#7061202-EL Electrical · Electrical VE will be moving some electrical outlets to a new location in support of GLY removal of a wall Status: Completed | Valley Electric Co. Of Mount Vernon Inc | $4K |
In Seattle, biggest first.