Get Procommercial project · Seattle, WA
Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical work permitted June 17, 2025, with 11 permits through October 28, 2026, declaring $1,132,989 of work. Contractor on record: Mastercraft Electric, Inc..
Establish use as office (previous use per applicant was office and proposed use is office) per land use code.Tenant improvements at levels 1 and 2 for office (Brinc at West Canal Yards) occupy per plan.
Seattle permit records name Mastercraft Electric, Inc., Cascadia Fire Protection and Exact Electric, LLC as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 3 permits issued in the last 30 days is included with Pro.
See the contractorCommercial and multifamily, biggest first.
11 permits issued Jun 17 – Oct 28, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 30 | #7163951-EL Electrical · Electrical Adding 10 notification devices and 2 relays to the existing fire alarm system. Status: Issued | Contractor with Pro | $8.3K |
| applied Aug 6 | #7152118-ME Mechanical · Trade Furnish and Install mechanical equipment and perform misc duct and GRD mods per plans Status: Issued | Not published | $59.9K |
| applied Jun 30 | #7145224-CN Addition/Alteration · Building Construct alterations to existing warehouse occupy per plan. Change of use from warehouse to light manufacturing per land use code. Status: Issued | Not published | $380K |
| applied Aug 6 | #7156877-EL Electrical · Electrical Install new LED lighting and controls in warehouse space. Install new circuits with receptacles for general purpose use and for equipment and furniture connections. [9/21/26 BGO - Approved Plan Set] Status: Issued | Mastercraft Electric, Inc. | $75K |
| applied Aug 6 | #7156885-EL Electrical · Electrical Relocating light fixtures in the first and second floor office spaces. New lighting controls for new conference rooms. New circuits with receptacles for general purpose, furniture connections and equipment. [9/21/26 KEF - Plan set approved.] Status: Issued | Mastercraft Electric, Inc. | $30K |
| applied Jun 17 | #7135824-CN Addition/Alteration · Building Establish use as office (previous use per applicant was office and proposed use is office) per land use code.Tenant improvements at levels 1 and 2 for office (Brinc at West Canal Yards) occupy per plan. Status: Issued | Not published | $570K |
#7158797-FS Fire Sprinkler and Suppression · Trade Modify the existing fire sprinkler system based on NFPA 13 and City requirements for the tenant improvements Status: Issued | Cascadia Fire Protection | $6K | |
#7157189-EL Electrical · Electrical Cat6 cabling to install cord drops for warehouse workstations Status: Issued | Mastercraft Electric, Inc. | — | |
#7157186-EL Electrical · Electrical Installing a new wall mounted telecom cabinet and Cat6 patch panels sized for cable count along with cabling to workstations within the office space Status: Issued | Mastercraft Electric, Inc. | — | |
#7125020-EL Electrical · Electrical Status: Completed | Exact Electric, LLC | — | |
#7091589-EL Electrical · Electrical Low Voltage Cabling for Telecom Devices - Job # 2544037 Status: Completed | Titan Electric Inc | $3.8K |
In Seattle, biggest first.