Get Procommercial project · Minneapolis, MN
Commercial General Building, Hvac/Mechanical, Plumbing, Roofing work permitted November 12, 2024, with 48 permits through October 5, 2026, declaring $80,931,849 of work. Contractor on record: Harris St Paul Inc.
remodel floors 2 through 5 - main west hospital building. certificate of occupancy required no const type: 1a occupancy: I2 2020 MSBC sprinklered: yes architect: klund #50240
Minneapolis permit records name Harris St Paul Inc, Je Dunn Construction and M . A . Mortenson as the contractors on this project, among 5 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 1 permit issued in the last 30 days is included with Pro.
See the contractorIn Minneapolis, biggest first.
48 permits issued Nov 12 – Oct 5, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#BLDG1199519 Mechanical · ComMFDRR Replace GRDs and Fans Status: Issued | Contractor with Pro | $692K | |
#BLDG1196897 Commercial · Remodel remodel floors 2 through 5 - main west hospital building. certificate of occupancy required no const type: 1a occupancy: I2 2020 MSBC sprinklered: yes architect: klund #50240 Status: Issued | Je Dunn Construction | $48M | |
#BLDG1197763 Commercial · Remodel alterations in lower-level heart hospital for stretcher/bed repair shop. 6th floor main hospital off ice remodel (ROB area). certificate of occupancy required no const type: 1a occupancy: I2 2020 MSBC sprinklered: yes sac: _ Status: Issued | Je Dunn Construction | $659K | |
#BLDG1193486 Mechanical · ComMFDNR Installing two CRAC units with roof mounted dry coolers per approved plans. Status: Issued | Harris St Paul Inc | $385K | |
#BLDG1196922 Commercial · Remodel REMODEL const type: IA occupancy: I-2 2020 MSBC sprinklered: YES architect: 53825 - Abeln, Daniel Jonathon Status: Issued | Je Dunn Construction | $512K | |
#BLDG1195284 Commercial · Remodel upgrade finishes in existing lower-level surgical patient prep and recovery area. certificate of occupancy required no const type: 1a occupancy: I2 2020 MSBC sprinklered: yes architect: abeln #53825 EAPC architec Status: Issued | Je Dunn Construction | $4.1M | |
#BLDG1187680 Commercial · Remodel ALLINA UPDATING ABBOTT NORTHWESTERN 920 BLDG WITH NEW TECHNOLOGY ON LOWER LEVEL AND 5TH FLOOR. WORK IS RELATED TO BLDG1143753, BLDG1155448, BLDG1159201, BLDG1163398, BLDG1181197. (JJL) 920 BUILDING IS LOCATED WEST OF THE PARKING RAMP AND NORTH OF 28 Status: Issued | M . A . Mortenson | $668K | |
#BLDG1190132 Commercial · Remodel SELECTIVE DEMO ONLY, NO CONSTRUCTION - FLOORS 2, 3, 4, 5 2020 MSBC architect: 50240 - Klund, Jennifer Lynne @ HGA Status: Issued | Je Dunn Construction | $1.8M | |
#BLDG1187513 Mechanical · ComMFDNR BP #6. Provide and install (2) mini split cooling units, (2) bathroom exhaust fans and misc. duct modifications BLDG1187513 Status: Issued | Harris St Paul Inc | $98K | |
#BLDG1187620 Plumbing · ComMin Description: BP #6. Provide water, waste and vent tie into existing for install of new bathroom. Fixture count: (1) sink/ Lav (1) toilet Valuation: 63,000.00 Status: Issued | Harris St Paul Inc | — | |
#BLDG1181197 Commercial · Remodel Abbott Northwestern Technology/data closet upgrades on the lower level and 2nd floor. Work includes Rooms TAF 101, TAF 102, TAF 134, I102, TAF 3010 TAF 4M2 TAF 4N2 and TAF 4M103. This work is related to Projects BLDG1143753, BLDG1155448 -ACW certific Status: Issued | Mortenson Construction | $803K | |
#BLDG1173493 Commercial · Remodel remodel data closets with new technology on lower level and 2nd floor. Rooms G309, G458, H2184, PB2004, and PB2004A This work is related to Projects BLDG1143753, BLDG1155448, BLDG1159201, and BLDG1163398. Status: Issued | Mortenson Construction | $736K | |
#BLDG1172718 Mechanical · ComMFDNR Installing CHW CRAC unit MW CRAC 203,204,205,206,207,208,209. Installing refrigeration CRAC units TAF DXSS 6M3B/3A per approved plans. Status: Issued | Harris St Paul Inc | $341K | |
#BLDG1171985 Mechanical · ComMFDNR I moved the symbol /abbreviation plan sheet M000 to the for-reverence file. (BLDG 1171985 - ProjectDox Prod ) CHW CRAC unit MW CRAC 201/202. 4 a/c, 2 CRAC for level 3 and 4 A/C for IT rooms and IT closet. Also duct modifications for level 3 office. Offic Status: Issued | Harris St Paul Inc | $341K | |
#BLDG1167097 Mechanical · ComMFDNR Add CHW CRAC unit to B2, E3079, PB3667, H0229B, CK1843, CK2799, H3117, E87D6. Add refrigeration CRAC unit to PB6600D, W7114E. Add AHU to serve R1 Data rm. Provide and install miscellaneous duct, vavs, grds, CHW and refrigeration piping. BLDG1167097 Status: Issued | Harris St Paul Inc | $1.2M | |
#BLDG1167160 Plumbing · ComMaj Waste and vent work at Abbott Northwestern Hospital. This project is for a state licensed health care facility and the plumbing plan review has been completed by the Minnesota Department of Labor and Industry in lieu of a review by the City of Minne Status: Issued | Harris St Paul Inc | — | |
#BLDG1164979 Commercial · RoofWind Reroof -ACW certificate of occupancy required no special inspections required no 2020 MSBC Status: Closed | Peterson Brothers Roofing And Construction Inc | $3.2M | |
#BLDG1163398 Commercial · Remodel Updating the Abbott Northwestern TAF and Main hospital west Building Data closets with new technology on 2nd and 3rd floor. Work includes Electrical and HVAC (Rooms 2903M, 2905M, and W2701). This work is related to Projects BLDG1143753, BLDG1155448, and B Status: Issued | M . A . Mortenson | $552K | |
#BLDG1155448 Commercial · Remodel ABBOTT NORTHWESTERN PIPER BUILDING AND MAIN EAST BUILDING DATA CLOSET UPGRADES. WORK TO BE DONE ON 2ND, 3RD, 6TH FLOOR. SEE PAGES "LEVEL 02 LIFE SAFETY PLAN", "LEVEL 03 LIFE SAFETY PLAN", AND "LEVEL 06 LIFE SAFETY PLAN" FOR DATA CLOSET LOCATIONS. Status: Issued | M . A . Mortenson | $921K | |
#BLDG1156711 Mechanical · ComMFDNR Duct alterations to data room K2 through K8. Adding 2 owner CRAC units. Status: Issued | Harris St Paul Inc | $16K | |
#BLDG1162124 Mechanical · ComMFDRR Replace GRDs and rebalance area. Status: Issued | Harris St Paul Inc | $16K | |
#BLDG1159201 Commercial · Remodel In existing hospital, update Data closets on LL, 1st, 2nd, and 7th floors (Rooms G928A, CK1842, CK2799 H0229, W7114G). This work is related to Projects BLDG1143753 and BLDG1155448 -ACW certificate of occupancy required no special inspections requi Status: Issued | M . A . Mortenson | $921K | |
#BLDG1158398 Plumbing · ComMin Abbott northwestern 5th Floor Replace one water fountain and demolishing 4 sinks (and capping water lines) in office area of 5th floor. Status: Closed | Harris St Paul Inc | — | |
#BLDG1155183 Plumbing · ComMin Install waste stand pipe and RPZ water line for new bone saw. Total job valuation: $20,100.00. Status: Closed | Harris St Paul Inc | — | |
#BLDG1143753 Commercial · Remodel Update Heart Hospital Data Closets certificate of occupancy required: no special inspections required: no SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. occupancy: B/I-2 2020 MS Status: Issued | Mortenson Construction | $1M | |
#BLDG1138373 Mechanical · ComMFDNR Replace existing boilers with new AHU in mechanical room. Remodel MRI-D with added piping, ductwork, accessories and equipment. BLDG1138373 New ducts and piping though out building including roof. Status: Issued | Harris St Paul Inc | $500K | |
#BLDG1138112 Mechanical · ComMFDNR Rework ductwork in ED CT and Mechanical equipment room. Replace VAV and add chilled water station with heat exchanger, pump and associated accessories per plans Status: Issued | Harris St Paul Inc | $120K | |
#BLDG1138108 Mechanical · ComMFDRR Replace 7 GRD's Status: Issued | Harris St Paul Inc | $16.5K | |
#BLDG1138375 Plumbing · ComMin Install new domestic water to MRI-D expansion, along with (3) lavs and (1) mop-sink. Status: Closed | Harris St Paul Inc | — | |
#BLDG1138118 Plumbing · ComMin Add a floor sink Status: Issued | Harris St Paul Inc | — | |
#BLDG1138106 Plumbing · ComMin DEMO SINK, INSTALL NEW FAUCET AND SINK Status: Closed | Harris St Paul Inc | — | |
#BLDG1129232 Mechanical · ComMFDNR " Controls are not included in this permit. The controls contractor shall obtain a separate permit. " HVAC system, installing VAV boxes with hot water reheat coils, GRDs and all associated ductwork per approved plans. Status: Issued | Harris St Paul Inc | $165K | |
#BLDG1130931 Commercial · Remodel remodel of CT room E1612 for new equipment. certificate of occupancy required no const type: 1a occupancy: I2 2020 MSBC sprinklered: yes architect: Leo Daly engineer: MBJ Status: Closed | Mortenson Construction | $370K | |
#BLDG1129521 Plumbing · ComMin abbott west. restrooms & drinking fountain Status: Closed | Harris St Paul Inc | — | |
#BLDG1122804 Commercial · Remodel alterations to replace emergency department CT machine and associated equipment. certificate of occupancy required no const type: 1a occupancy: I2 2020 MSBC sprinklered: yes architect: nelson #42247 leo daly architects Status: Closed | Je Dunn Construction | $935K | |
#BLDG1119140 Commercial · Remodel REMODEL ON 1ST FLOOR FOR EQUIPMENT const type: II-B occupancy: I-2 2020 MSBC architect: 53825 - Abeln, Daniel Jonathon @ EAPC engineer: 23148 - Trofimova-Peterson, Irene @ MBJ Status: Closed | Je Dunn Construction | $4.9M | |
#BLDG1116920 Commercial · Remodel remodeling outpatient clinic areas of 3rd and 6th floor. piper neuro expansion. certificate of occupancy required no const type: 1a occupancy: B - outpatient clinic space 2020 MSBC sprinklered: yes architect: Abeln #5382 Status: Closed | Je Dunn Construction | $2.9M | |
#BLDG1111397 Mechanical · ComMFDNR BLDG1111397 3 new Data Center cooling systems. Data rooms are located on level 2,3, and 4 Ducted fan coils units. Condensers are located on the roof. Status: Closed | Harris St Paul Inc | $243K | |
#BLDG1105974 Commercial · Remodel alterations related to equipment upgrades for winter cooling. engineer: trofimova-peterson #23148 Status: Closed | Je Dunn Construction | $3.8M | |
#BLDG1107239 Mechanical · ComMFDNR New diffuser layout. BLDG1107239 Status: Closed | Harris St Paul Inc | $6.8K | |
#BLDG1108011 Plumbing · ComMin Demo (1) existing sink. Provide and install (1) new sink faucet and trim for integral sink. Status: Closed | Harris St Paul Inc | — | |
#BLDG1108010 Mechanical · ComMFDNR Replacing GRDs and all associated ductwork per approved plans. Status: Closed | Harris St Paul Inc | $2K | |
#BLDG1104143 Commercial · Remodel remodel X-ray room C. certificate of occupancy required no const type: 1a occupancy: I2 2020 MSBC architect: daly Status: Closed | Je Dunn Construction | $286K | |
#BLDG1103320 Mechanical · ComMFDNR Installing two VAV boxes, GRDs and all associated ductwork per approved plans. Status: Closed | Harris St Paul Inc | $24.9K | |
#BLDG1104356 Plumbing · ComMin Add extra sink to BLDG1098529 Status: Closed | Harris St Paul Inc | — | |
#BLDG1098529 Plumbing · ComMin 1st and 2nd Flr NUC Med and Uptake - Scope of work: Demo (1) mop sink and (1) ss drop in counter sink. Provide and install (1) mop sink and (1) ss drop in counter sink.Fixture counts are: (1) Mop sink.(1) SS drop in hand sink Status: Closed | Harris St Paul Inc | — | |
#BLDG1094383 Mechanical · ComMFDNR . The specific area of work was not identified in the construction documents. Status: Closed | Harris St Paul Inc | $80.8K | |
#BLDG1094386 Plumbing · ComMin Provide and install (1) RO/ DI system. Connect water and waste to existing services. Install(1) floor drain. (1) mop sink. Status: Closed | Harris St Paul Inc | — |