Get Procommercial project · Minneapolis, MN
Commercial General Building, Hvac/Mechanical, Plumbing work permitted January 2, 2025, with 13 permits through September 23, 2026, declaring $6,108,771 of work. Contractor on record: Metropolitan Mechanical Contractors.
Allina Health - New 2nd Floor Pharmacy certificate of occupancy required: no special inspections required: no SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING/AIR CONDITIONING/VENTILATION WORK. const type: 1B occupancy:
Minneapolis permit records name Metropolitan Mechanical Contractors, Je Dunn Construction and Gilbert Mechanical Contractors, LLC as the contractors on this project, among 6 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
13 permits issued Jan 2 – Sep 23, newest first.
| Issued | Permit |
|---|
| Contractor |
|---|
| Value |
|---|
#BLDG1197187 Commercial · Remodel INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY ___1,200_ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 Subp.5a as applicable. ADDITIONAL PERMITS: PV SYSTEMS ALSO REQUIRE Status: Issued | Blue Horizon Energy | $1.2M | |
#BLDG1184171 Plumbing · ComMin 1 lav sink and 1 toilet Status: Closed | Harris St Paul Inc | — | |
#BLDG1166171 Commercial · Remodel ALTER ROOF DRAIN SYSTEM 2020 MSBC architect: 53825 - Abeln, Daniel Jonathon @ EAPC engineer: 61683 - Wuollet, John Christopher @ MBJ Status: Closed | M . A . Mortenson | $1.3M | |
#BLDG1161702 Mechanical · ComMFDNR BLDG1161702 Rework HVAC to accommodate lab sterilizer replacement. Includes HPS piping modifications and duct modifications. Status: Closed | Gilbert Mechanical Contractors, LLC | $32.7K | |
#BLDG1161749 Plumbing · ComMin Remodel for lab sterilizer replacement. Other Fixtures: (2) Floor Sinks & (4) RPZ Backflow Preventers Status: Closed | Gilbert Mechanical Contractors, LLC | — | |
#BLDG1108728 Mechanical · ComMFDNR HVAC system for pharmacy area remodel, installing DX split system, VAV boxes, return fan, air valve, GRDsand all associated ductwork per approved plans. Status: Closed | Metropolitan Mechanical Contractors | $96.3K | |
#BLDG1108727 Mechanical · ComMFDNR Structural drawings for the chiller have been uploaded into for reference folder. Chiller addition and chiller piping modifications. BLDG1108727 Status: Closed | Metropolitan Mechanical Contractors | $296K | |
#BLDG1108729 Plumbing · ComMin Abbott Northwestern TAF Pharmacy - Modify existing plumbing for new floor plan and new fixtures. See attached plumbing plans by Dunham Associates. Fixtures marked "other" are Emergency Eyewash Stations. Status: Closed | Metropolitan Mechanical Contractors | — | |
#BLDG1106100 Mechanical · ComMFDNR HVAC system, installing steam humidifier manifold in existing duct and associated piping per attached drawings. Status: Closed | Metropolitan Mechanical Contractors | $22.2K | |
#BLDG1103010 Commercial · Remodel REMODEL - STORAGE SPACE const type: IB occupancy: B 2020 MSBC architect: 53825 - Abeln, Daniel Jonathon Status: Closed | Je Dunn Construction | $77K | |
#BLDG1095735 Commercial · Remodel NEW ROOFTOP CHILLER AND STRUCTURAL WORK. 1ST AND 4TH FLOOR. (JJL) TAF CHILLER ALLINA HEALTH ENGINEER: IRENETROFIMOVA-PETERSON #23148 ARCHITECT: DANIEL ABELN #53825 SPECIAL INSPECTIONS: BRAUN INTERTEC Status: Closed | Je Dunn Construction | $1.2M | |
#BLDG1097646 Commercial · Remodel Allina Health - New 2nd Floor Pharmacy certificate of occupancy required: no special inspections required: no SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING/AIR CONDITIONING/VENTILATION WORK. const type: 1B occupancy: Status: Closed | Je Dunn Construction | $1.8M | |
#BLDG1100702 Commercial · Remodel BUILD 2 OFFICES ON 2ND FLOOR OF 10TH AVE FACILITY const type: IB occupancy: B 2020 MSBC architect: 53825 - Abeln, Daniel Jonathon Status: Closed | Je Dunn Construction | $100K |