Get ProEvery project in every city · from $79/mo
Get Procommercial project · Minneapolis, MN
Commercial General Building, Hvac/Mechanical, Plumbing work permitted November 7, 2024, with 14 permits through September 8, 2026, declaring $12,339,701 of work. Contractor on record: Northern Air Corp.
remodel triage, care, waiting, and acute psychiatric intake areas on first floor. emergency department. certificate of occupancy required no 0 SAC per 8/20/25 MCES letter const type: 1a occupancy: I2 2020 MSBC sprinklered: ye
Minneapolis permit records name Northern Air Corp, Peterson Sheet Metal Inc and HDR Architects as the contractors on this project, among 8 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
14 permits issued Nov 7 – Sep 8, newest first.
| Issued | Permit | Contractor | Value |
|---|
#BLDG1197062 Mechanical · ComMFDNR HVAC system alteration, using existing AHUs and installing fan-coils, VAV and fan-powered boxes, heating coils, GRDs and all associated ductwork per approved plans. Status: Issued | Peterson Sheet Metal Inc | $595K | |
#BLDG1197059 Plumbing · ComMaj Remodel of existing building. New underground plumbing/domestic water/med gas. Licensed health care facility. Plan review was performed by MN DOLI and is uploaded to documents folder in ProjectDox and in ELMS. No City of Minneapolis plan review r Status: Issued | Peterson Sheet Metal Inc | — | |
#BLDG1184015 Commercial · Remodel ALTERATION TO ELEVATOR HOISTWAY RELATED TO Elevator permit #ELV-P2512-0202 2020 MSBC Status: Issued | Total Construction Solutions | $20K | |
#BLDG1183761 Plumbing · ComMaj No City of Minneapolis plan review is required. State licensed facility. Plan review was performed by DOLI and DOLI review letter is located in the documents folder in ProjectDox. All plumbing shall be installed in accordance with the 2020 Minneso Status: Issued | Northern Air Corp | — | |
#BLDG1160678 Commercial · Remodel remodel lower level - histology lab. certificate of occupancy required no const type: 1a occupancy: I-2 2020 MSBC sprinklered: yes sac: _0_charges __ met council letter dated _1/4/26_ architect: mohagen hanson Status: Issued | Mohagen Hansen Architects | $2M | |
#BLDG1135780 Commercial · Remodel remodel triage, care, waiting, and acute psychiatric intake areas on first floor. emergency department. certificate of occupancy required no 0 SAC per 8/20/25 MCES letter const type: 1a occupancy: I2 2020 MSBC sprinklered: ye Status: Issued | Je Dunn Construction | $6.2M | |
#BLDG1149221 Mechanical · ComMFDNR BLDG1149221 1 new supply branch duct added to security room P1.672 and relocate 2 GRD's for P1.672. Also rebalance diffuser for room P1.671 all related to Purple 1 Entry. Demo and replace branch duct/flex duct/and GRD with new. Reattached new ducts Status: Closed | Northern Air Corp | $22.5K | |
#BLDG1149222 Plumbing · ComMin HCMC/Lav sink, toilet, drinking fountain, sink Status: Issued | Northern Air Corp | — | |
#BLDG1139469 Commercial · Remodel security upgrades at 5 entries. purple 1 entry, purple 2 skyway entry, red CSC skyway entry, blue 1 entry, and CSC main building level 1 entry. certificate of occupancy required no sprinklered: yes architect: klund #50240 HGA architects Status: Issued | Kraus Anderson Construction Co | $684K | |
#BLDG1134838 Plumbing · ComMaj Hospital project - plumbing plan review was performed by MN Dept. of Labor and Industry. The DOLI plan review letter can be found in the documents folder in ProjectDox. Status: Closed | Northern Air Corp | — | |
#BLDG1141894 Commercial · Remodel collect 3 SAC for BLDG1134373 - HCMC 7th fl Status: Closed | HDR Architects | — | |
#BLDG1134924 Mechanical · ComMFDNR HVAC system, alteration of existing system, adding new fan-coils, reheat coils, piping, GRDs and all associated ductwork per approved plans. Status: Closed | Northern Air Corp | $145K | |
#BLDG1134373 Commercial · Remodel alterations on 7th floor, orange building, pediatric medical suite. approx 3200 sq ft. certificate of occupancy required no const type: 1a occupancy: I2 2020 MSBC sprinklered: yes sac: _3_charges _ met council letter dated Status: Closed | HDR Architects | $2.1M | |
#BLDG1090096 Mechanical · ComMFDRR Replace two existing generators Status: Closed | Schadegg Mechanical | $577K |