Commercial General Building, Hvac/Mechanical, Plumbing work permitted May 5, 2025, with 8 permits through August 12, 2026, declaring $567,883 of work. Contractor on record: Legacy Companies Inc.
Modifications to DNA amplification lab and storage certificate of occupancy required: no special inspections required: no SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. const type:
Minneapolis permit records name Legacy Companies Inc, Donlar Construction Company and Sun Mechanical Inc as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
8 permits issued May 5 – Aug 12, newest first.
| Issued | Permit | Contractor | Value |
|---|
In Minneapolis, biggest first.
#BLDG1194205 Mechanical · ComMFDRR Replace (2) existing steam to water heat exchanger. Low pressure systems per contractors' email. Most recently uploaded as an attachment. Status: Issued | Legacy Companies Inc | $68.8K | |
#BLDG1175405 Mechanical · ComMFDNR Installing new exhaust fan, exhaust duct, fire smoke damper, at ceiling floor penetration. BLDG1175405 (Basement level) Exhaust fan # 34 as shown in the drawings. Status: Closed | Legacy Companies Inc | $6.2K | |
#BLDG1156805 Commercial · Remodel Add storage room to basement (revision to BLDG1111199) certificate of occupancy required: no special inspections required: no SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. const type: Status: Closed | Donlar Construction Company | $150K | |
#BLDG1149885 Commercial · Remodel REPLACE WINDOWS. (JJL) ARCHITECT: HA+D - MARCUS HUMLER #52841 TYPE IIB CONSTRUCTION FULLY SPRINKLERED OCCUPANCY TYPE: B, S2, A3 NO CHANGE TO OCCUPANCY COUNT BASEMENT AREA = 28,875 SF MAIN FLOOR = 28,500 SF Status: Closed | Gardner Builders | $81.9K | |
#BLDG1113979 Mechanical · ComMFDNR Work is located on the basement level and Level 1. Install five VAVs, one exhaust fan, and associated duct systems for each level. Connect the new duct systems to the existing infrastructure. Note that plumbing and hydronic work are not included under thi Status: Closed | Legacy Companies Inc | $41.5K | |
#BLDG1111199 Commercial · Remodel Modifications to DNA amplification lab and storage certificate of occupancy required: no special inspections required: no SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. const type: Status: Closed | Donlar Construction Company | $210K | |
#BLDG1115995 Plumbing · ComMin 1ST FLOOR ROOM 180 - CONNECT NEW HAND SINK TO EXISTING CW, HW, & SANITARY PIPING IN WALL AT PREVIOUSLY REMOVED LAVATORY SINK. BASEMENT LEVEL ROOM B59 - RUN CW, HW, NEW SANITARY PIPING TO NEW HAND SINK, EMERGENCY SHOWER/EYEWASH WITH THERMOSTATIC MIXER, AND Status: Closed | Sun Mechanical Inc | — | |
#BLDG1116036 Mechanical · ComMFDRR repair/replace hydronic piping Status: Closed | Sun Mechanical Inc | $10K |