Issued May 16 · 7 permits
$13.5M
renovation of portions of 1st, 2nd, and 3rd floors converting office spaces into behavioral health secure living facility and treatment/support spaces. certificate of occupancy…
Get ProEvery project in every city · from $79/mo
Get ProMonthly permit report
By declared value.
Issued May 16 · 7 permits
$13.5M
renovation of portions of 1st, 2nd, and 3rd floors converting office spaces into behavioral health secure living facility and treatment/support spaces. certificate of occupancy…
Issued May 2 · 3 permits
$5.8M
HVAC system alteration, installing new air handling units, vav boxes, exhaust fans, hydronic piping, finned tube radiations, GRDs and all associated ductwork per approved plans.
Source: building permit records from official city open-data portals, checked daily. Data through . How we count
Issued May 14 · 2 permits
$2.5M
Replacing three existing air handling units with energy recovery section, new hydronic piping, pumps, exhaust fans, per approved plans.
Issued May 29 · 3 permits
$1.1M
Interior remodel of 15th floor office space -ACW certificate of occupancy required: no const type: I-A occupancy: B 2020 MSBC occupant load: 204 sprinklered: yes Tenant: Hennepin…
Issued May 8
$700K
1. Approval of these plans shall not be construed as permitting a violation of the building codes or any other laws or ordinances. HVAC system for 4 story 23 units apartment…
Issued May 12
$591K
Roof repair/recover -ACW certificate of occupancy required no special inspections required no
Issued May 13
$350K
HVAC system, installing rooftop units, demand-controlled ventilation for RTU-4, GRDs and all associated ductwork per approved plans.
Issued May 2
$336K
Concrete cap replacement, tuckpointing (MAA)
Issued May 28 · 2 permits
$217K
construct rear patio enclosure addition. certificate of occupancy required: no const type: 5b occupancy: a22020 MSBC sprinklered: yes sac: _0_charges _ met council letter dated…
Issued May 15 · 3 permits
$173K
REMODEL AT GROUND FLOOR LEVEL OF CONDO DWELLING UNIT ENTRY, OFFICE, AND PRIMARY SUITE (INCLUDING TWO BATHROOMS). DEMO SELECT WALLS AT HALLWAY, CLOSET, BATHROOM AND SUNROOM,…
Other months: September 2026 · August 2026 · July 2026 · June 2026 · May 2026 · April 2026