Issued Apr 9 · 9 permits
$5.1M
remodel west wing of first floor. certificate of occupancy required no const type: 1b occupancy: e 2020 MSBC sprinklered: yes sac: _0_charges __ met council letter dated…
Get ProEvery project in every city · from $79/mo
Get ProMonthly permit report
By declared value.
Issued Apr 9 · 9 permits
$5.1M
remodel west wing of first floor. certificate of occupancy required no const type: 1b occupancy: e 2020 MSBC sprinklered: yes sac: _0_charges __ met council letter dated…
Issued Apr 14 · 14 permits
$4.2M
children's hospital emergency department remodel. certificate of occupancy required no special inspections required yes no const type: 1a occupancy: I2 2020 MSBC sprinklered: yes…
Source: building permit records from official city open-data portals, checked daily. Data through . How we count
Issued Apr 17 · 5 permits
$3.3M
Front Entrance/Canopy and interior remodel certificate of occupancy required: no special inspections required: yes const type: IIA occupancy: E 2020 MSBC sprinklered: yes 20%…
Issued Apr 30 · 11 permits
$3M
interior demo and refinish of areas opened up for sprinkler system replacement on floor 23 through 30. special inspections of firestopping required and provided by Braun
Issued Apr 30 · 4 permits
$2.7M
RESTAURANT REMODEL. (JJL) certificate of occupancy required: no special inspections required: no const type: IA occupancy: A2 2020 MSBC occupant load: 497 sprinklered: yes…
Issued Apr 20 · 5 permits
$1.9M
structural maintenance of parking ramp. engineer: Deiss #26604
Issued Apr 24 · 9 permits
$1.6M
Remodel clinic -ACW certificate of occupancy required: no special inspections required: no const type: I-B occupancy: B 2020 MSBC occupant load: 31 sprinklered: yes Tenant:…
Issued Apr 16 · 4 permits
$1.4M
TENANT IMPROVEMENT OF 3000 SFT OF SHELL SPACE INTO A RESTAURANT IN A MULTI-TENANT BUILDING -ACW certificate of occupancy required: yes CONST TYPE: IA NUMBER OF STORIES: 1…
Issued Apr 10
$1.3M
New siding on portions of building -ACW certificate of occupancy required: no special inspections required: no 2020 MSBC windows with sill heights less than 36 inches above the…
Issued Apr 15 · 3 permits
$1.3M
Addition and interior remodel of existing structure -ACW certificate of occupancy required: no special inspections required: no const type: 5B occupancy: A-3 2020 MSBC occupant…
Other months: September 2026 · August 2026 · July 2026 · June 2026 · May 2026 · March 2026