Commercial General Building work permitted April 24, 2025, with 2 permits through September 15, 2025, declaring $109,842 of work. Contractor on record: Votze Butler Associates, Inc..
Dental Hygenist Office fitout in existing building (fully sprinklered)The project involves the construction required to restore two fire-damaged rooms (Rooms 746 and 747) within the Harvard Dental Center. The total area of the affected rooms is approximately 250 square feet. The restoration scope includes drywall replacement, ceiling lights, flooring, MEP connections, and all associated finishes needed to return the spaces to clinical use in accordance with current building code, life safety, and accessibility standards.
Cambridge permit records name Votze Butler Associates, Inc. and Clean Joe LLC as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
2 permits issued Apr 24 – Sep 15, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 22 |
Commercial and multifamily, biggest first.
#1180517 Building: Alteration and Addition Dental Hygenist Office fitout in existing building (fully sprinklered)The project involves the construction required to restore two fire-damaged rooms (Rooms 746 and 747) within the Harvard Dental Center. The total area of the affected rooms is approximately 250 square feet. The restoration scope… Status: Complete |
| Votze Butler Associates, Inc. |
| $79.8K |
| applied Apr 14 | #1159884 Building: Alteration and Addition Clean Joe LLC will be removing all the fire/water affected drywalls, ceilings, and floors to clean up and prevent further damages. Interior finishes only. ( No Construction) Status: Active | Clean Joe LLC | $30K |