Get ProEvery project in every city · from $79/mo
Get Procommercial project · Cambridge, MA
Commercial General Building work permitted March 3, 2025, with 5 permits through October 19, 2026, declaring $1,841,071 of work. Contractor on record: Paulo Ramalhinho.
Cambridge permit records name Paulo Ramalhinho, Votze-Butler Associates and Gage Construction as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 1 permit issued in the last 30 days is included with Pro.
See the contractor5 permits issued Mar 3 – Oct 19, newest first.
| Issued |
|---|
Commercial and multifamily, biggest first.
| Permit |
|---|
| Contractor |
|---|
| Value |
|---|
| applied Oct 1 | #1232711 Building: Alteration and Addition Interior alteration (Level 2, IEBC Work Area Method) of approximately 5,120 SF of existing office space, Suite 165 on the 1st floor of an existing 6-story, fully sprinklered, non-combustible (Type I/II) office building, for Harvard VPAL. The use stays Business (B), with accessory A-3… Status: Active | Contractor with Pro | $246K |
| applied Jul 23 | #1222459 Building: Alteration and Addition Remove old ACT ceiling and lights, install new ACT ceiling with new LED lighting. Status: Complete | Paulo Ramalhinho | $133K |
| applied Dec 11 | #1193014 Building: Alteration and Addition Interior alterations at the third floor of 124 Mount Auburn Street. Work includes replacing existing ceilings/light fixtures, carpet patching, painting, millwork, spinkler re-work, HVAC re-work, demolition of a metal staircase, and infill of floor slab between floors 3 and 4. The 3rd floor become… Status: Complete | Votze-Butler Associates | $356K |
| applied May 15 | #1165431 Building: Alteration and Addition Demolition of existing office space and renovation of existing spaces. Build out of small medical office (1,100 SF) Status: Complete | Gage Construction | $290K |
| applied Feb 4 | #1150761 Building: Alteration and Addition REPLACEMENT OF COOLING TOWERS Status: Active | Chiller Technology | $816K |