Get Promultifamily project · Buffalo, NY
Multifamily Demolition, Electrical work permitted April 21, 2026, with 4 permits through June 1, 2026, declaring $515,000 of work. Contractor on record: Eric Winstanley.
2 buildings on site, this project is long building {The Ambassador} Geothermal Retrofit: Replacement of existing gas-fired boilers, radiators, and domestic hot water systems with a centralized all-electric geothermal system, including a vertical bore well field, basement heat pump plant, storage tanks, pumps, and hydronic distribution to in-unit fan coil units, along with new domestic hot water generation, piping, electrical service upgrades, and associated removals and utility modifications. *** Digeplan ***
Buffalo permit records name Eric Winstanley and Richard Ries as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
4 permits issued Apr 21 – Jun 1, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#REP26-9685930 REP-PLANS · LIGHT COMMERCIAL CONTRACTOR 2 buildings on site, this project is long building {The Ambassador} Geothermal Retrofit: Replacement of existing gas-fired boilers, radiators, and domestic hot water systems with a centralized all-electric geothermal system, including a vertical bore well field, basement heat pump plant, storage… |
| Eric Winstanley |
| $400K |
#REP26-9685932 REP-PLANS · LIGHT COMMERCIAL CONTRACTOR 2 Buildings on site this project {Building to the right} Geothermal Retrofit:Replacement of existing gas-fired boilers, radiators, and domestic hot water systems with a centralized all-electric geothermal system, including a vertical bore well field, basement heat pump plant, storage tanks, pumps,… | Eric Winstanley | $100K |
#TEAR26-9685442 TEAROUT · LIGHT COMMERCIAL CONTRACTOR Selective demolition of indicated non-load-bearing partitions located exclusively on the basement level of an existing Group R-2 multifamily apartment building. The demolition primarily consists of removing wooden storage enclosures and associated doors. All structural elements, including… | Eric Winstanley | $10K |
#TEAR26-9685441 TEAROUT *** AKA 173 North *** Selective demolition of indicated non-load-bearing partitions located exclusively on the basement level of an existing Group R-2 multifamily apartment building. The demolition primarily consists of removing wooden storage enclosures and associated doors. All structural… | Richard Ries | $5K |
In Buffalo, biggest first.