Multifamily Electrical, Hvac/Mechanical, Plumbing work permitted April 9, 2026, with 5 permits through September 21, 2026, declaring $1,006,460 of work. Contractor on record: David Muskopf JR.
This project involves installing a geo-thermal system to serve the 48 existing multi-family apartment units in the building. We will drill twelve boreholes, which will be tied into the basement of the building. In the Building will be a central pumping station distributing the geothermal source fluid to the system. In the Building we will install 3 forced air unit for space conditioning and 3 domestic hot water heatpumps. In the future Hydronic Heatpumps and fancoils will be installed in the apartments, these will be applied for under separate permits. The existing the current apartment hot…
Buffalo permit records name David Muskopf JR, Master Electrician Frank A Horvath and Johannes Rosemann as the contractors on this project, among 5 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
5 permits issued Apr 9 – Sep 21, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#PLUM26-9701515 PLUMBING · PLUMBERS MASTER Install hot and cold piping and returns with recirc pump on geothermal heating system located at 870 Lafayette Ave. | David Muskopf JR | $50K | |
#ELEC26-9706439 ELECTRICAL · MASTER ELECTRICIAN Wiring of geothermal hot water and heating system. With a temporary connection to outside disconnect for generator connection. Permanently installed 400-amp 3 phase geo main panel. Branch wiring to all geo units with disconnects and over current protection. | Master Electrician Frank A Horvath | $10K | |
#HEAT26-9705158 HEATING · HEATING CONTRACTOR This project involves installing a geo-thermal system to serve the 48 existing multi-family apartment units in the building. We will drill twelve boreholes, which will be tied into the basement of the building. In the Building will be a central pumping station distributing the geothermal source… | Johannes Rosemann | $738K | |
#PLUM26-9685790 PLUMBING · PLUMBERS MASTER Install 6 new DHW storage (geothermal) tanks and all water connections to and from existing hot, cold and recirculation distribution systems. Closed loop geothermal pipework to be done by others. See P100 (page 13) of REP26-9681910 | Daniel G Sprague | $8K | |
#REP26-9681910 REP-PLANS · LIGHT COMMERCIAL CONTRACTOR ( Geothermal Retrofit ) Replacement of existing gas-fired boilers, radiators, and domestic hot water systems with a centralized all-electric geothermal system, including a vertical bore well field, basement heat pump plant, storage tanks, pumps, and hydronic distribution to in-unit fan coil units,… | Eric Winstanley | $200K |