Multifamily Electrical, Hvac/Mechanical, Plumbing work permitted June 23, 2025, with 7 permits through September 29, 2026, declaring $1,966,740 of work. Contractor on record: Eric Winstanley.
This project involves installing a geo-thermal system to serve the 49 existing multi-family apartment units. We will drill eight-teen boreholes, which will be tied into the basement of the two building halves. In each Building half we will install 6 hydronic heatpumps and 2 forced air units for space conditioning and 3 domestic hot water heatpumps. In a future install fancoils will be installed in the apartments. The existing the current apartment hot water and HVAC systems will remain operational until the new geo-thermal fan coil units are fully installed.
Buffalo permit records name Eric Winstanley, Evan Smith and Johannes Rosemann as the contractors on this project, among 5 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
7 permits issued Jun 23 – Sep 29, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|
#HEAT26-9708257 HEATING · HEATING CONTRACTOR Installing cooling only split systems to cool the battery rooms | Evan Smith | $140K | |
#HEAT26-9676624 HEATING · HEATING CONTRACTOR This project involves installing a geo-thermal system to serve the 49 existing multi-family apartment units. We will drill eight-teen boreholes, which will be tied into the basement of the two building halves. In each Building half we will install 6 hydronic heatpumps and 2 forced air units for… | Johannes Rosemann | $1.3M | |
#REP25-9667226 REP-PLANS · LIGHT COMMERCIAL CONTRACTOR The existing HVAC and domestic hot water systems, including the gas-fired boiler, will be replaced with a new all-electric geothermal heat pump (GHP) system and hot water storage tanks located in the basement, with new walls constructed to restrict tenant access to the equipment. The electrical… | Eric Winstanley | $350K | |
#PLUM25-9669863 PLUMBING · PLUMBERS MASTER New Domestic hot and cold-water connections to and from new Geothermal equipment in two areas. Closed loop Geothermal work done by others. Replumbing of 2 laundry rooms. Installation of 2 booster pumps. Two new backflow devices (DCVA). See plans for REP25-9667226; page 13 (P100) | Daniel G Sprague | $60K | |
#ELEC25-9669803 ELECTRICAL Wiring of 22 geothermal units and 2 circulation pumps | Christopher R.C. Copland | $63K | |
#GC24-9627232 GC · LIGHT COMMERCIAL CONTRACTOR ( 20 Morris aka 19 Benwood ) Alter existing covered parking area to include ( Automobile Charging Station ) use. Electrical service upgrade to provide power for 11 new Electric vehicle chargers within an existing covered parking area. ***DIGEPLAN*** | Eric Winstanley | $60K | |
#REP25-9645743 REP-PLANS · LIGHT COMMERCIAL CONTRACTOR *** AKA 19 Benwood *** Drilling of 18 geothermal wells and installation of closed loop field tied and capped at existing building for future geo thermal HVAC and water heater system. Existing HVAC and water heater system to remain in place. *** digeplan *** *** any ACM removal must be completed by… | Eric Winstanley | $80K |
In Buffalo, biggest first.