Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Mep, Plumbing work permitted March 19, 2025, with 11 permits through October 27, 2026, declaring $1,138,270 of work. Contractor on record: Joseph Daniel.
New Metal Stud & Drywall WallsNew Ceramic Flooring & Wall Tile. New Soft Flooring in areas not to receive ceramic tile.Replacement of Existing Doors and addition of (1) new door.Fresh Paint on new and existing walls throughout construction area.New Ductwork, Electrical and plumbing, including new underground sanitary for bathroom and locker room.(4) New Showers, new bathroom fixtures, partitions and accessories.New Millwork and Countertops at Kitchenette & BathroomsRetro fit existing sprinkler with new branch lines and sprinkler heads.New Electrical PanelNew Electric Duct Heaters, ERV's &…
Buffalo permit records name Joseph Daniel, Lou Visone and Jeffrey Panza as the contractors on this project, among 6 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
Commercial and multifamily, biggest first.
The contractor on 2 permits issued in the last 30 days is included with Pro.
See the contractor11 permits issued Mar 19 – Oct 27, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#HEAT26-9712756 HEATING · HEATING CONTRACTOR HVAC upgrades for control room; installing split systems, ERV with diffusers. | Contractor with Pro | $290K | |
#TEAR26-9712586 TEAROUT · GENERAL CONTRACTOR This permit is for the tear out portion of the work only and should be reviewed in conjunction with IBO26-9701584. *** any asbestos disturbed by this project must be removed by a licensed handler and a clean letter must be provided to the inspector prior to final inspection *** | Contractor with Pro | $60K | |
#HEAT26-9700368 HEATING · HEATING CONTRACTOR Installation of water source heat pumps, exhaust fan, electric radiant ceiling panels, associated ductwork and RGDs as per spec'd plans | Robin Cloy | $97.8K | |
#ELEC26-9684195 ELECTRICAL REMOVE EXISTING GENERATOR, SWITCHGEAR & EQUIPMENT IN GENERATOR ROOM. RENOVATE EXISTING ROOM WITH NEW PAINT, EPOXY FLOOR, LIGHTING, EQUIPMENT ETC. INSTALL NEW GENERATOR & SWITCHGEAR & TIE INTO EXISTING SWITCHGEAR. | Joseph Daniel | — | |
#PLUM26-9682177 PLUMBING · PLUMBERS MASTER Install Approximately 310 LF of 12" HDPE Storm Drainage, (2) New Catch Basins, and Tie into existing catch basin onsite. | Lou Visone | $40K | |
#PLUM25-9656901 PLUMBING · PLUMBERS MASTER Install approximately 560 LF of 12" HDPE storm drainage, 5 new catch basins, (1) stormwater quality unit, and (2) inspection ports on an existing underground detention system | Lou Visone | $40.5K | |
#PLUM25-9656845 PLUMBING · PLUMBERS MASTER Re model Existing Mens and Womens Restrooms | Purtill Plumbing LLC | $85K | |
#TEAR25-9642647 TEAROUT ( TEAR OUT PERMIT ONLY IN PREPARATION FOR FUTURE WORK TO BE DONE ON A SEPARATE PERMIT ) Removal of Existing Finishes in the Crew Line Bathroom & Locker Room. Existing MEP's will be removed as per the drawings. Any MEP's to remain will be made safe as per code. Sprinkler System Branch Lines to be… | Jeffrey Panza | $40K | |
#IBO25-9642649 INTBLDOUT New Metal Stud & Drywall WallsNew Ceramic Flooring & Wall Tile. New Soft Flooring in areas not to receive ceramic tile.Replacement of Existing Doors and addition of (1) new door.Fresh Paint on new and existing walls throughout construction area.New Ductwork, Electrical and plumbing, including new… | Jeffrey Panza | $500K | |
#TRST25-9644100 TOWERSATT TOWER:RETAIN:(3) C-BAND ANTENNA/RRH UNITS(3) AWS/PCS RRH UNITS(3) 700/850 RRH UNITS(3) CBRS ANTENNA/RRH UNITS(1) 12-CIRCUIT OVP UNITREMOVE:(6) PANEL ANTENNASPROPOSED:(4) ANTENNAS(3) AWS/PCS RRH UNITS(1) 700/850 RRH UNIT(1) 12-CIRCUIT OVP UNIT(5) QUAD DIPLEXERSCABLING:RETAIN:(2) 6x12 HYBRID… | Will Brooking | $25K | |
#ELEC25-9636253 ELECTRICAL · MASTER ELECTRICIAN REPLACE EXISTING SWITCHGEAR, UPS AND PDU EQUIPMENT WITH NEW FEEDER AND BRANCH CIRCUITS TO ALL NEW AND EXISTING EQUIPMENT PER DRAWINGS. DEMO ALL OLD EQUIPMENT AND CIRCUITS ONCE NEW EQUIPMENT IS CUT OVER. | Joseph Daniel | — |