Get Promultifamily project · Buffalo, NY
Multifamily General Building, Electrical, Roofing work permitted November 26, 2024, with 10 permits through August 7, 2026, declaring $638,500 of work. Contractor on record: Master Electrician Frank A Horvath.
There are (2) separate buildings located on one parcel (1106-1110 Main street). The scope of work is the same for both buildings. Remove and replace the existing windows, HVAC system and centralized hot water system. Provide a new fully electrical geothermal heating/cooling system with integrated hot water tanks. Insulate the existing flat roof and provide new TPO roof system. Patch and repair any damaged gypsum board and finishes. Exterior work Minor masonry repointing and repainting, vine removal. *** Digeplan *** *** negative asbestos survey attached *** *** separate electrical, plumbing…
Buffalo permit records name Master Electrician Frank A Horvath, Jeffrey Murray and Eric Winstanley as the contractors on this project, among 6 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
10 permits issued Nov 26 – Aug 7, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#FEND26-9695620 FENDRIVE back parking lot to be repaved (6,000 square feet) | Stock Service Inc | $12K | |
#REP26-9681649 REPAIR · LIGHT COMMERCIAL CONTRACTOR Install new .060 TPO Adhered roof system with 20 year 90 mph warranty. Add additional insulation. No tear off. | Jeffrey Murray | $83.5K | |
#REP26-9681650 REPAIR · LIGHT COMMERCIAL CONTRACTOR Install new .060 TPO Adhered roof system with 20 year 90 mph warranty. Add additional insulation. No tear off. | Jeffrey Murray | $83.5K | |
#ELEC26-9673071 ELECTRICAL Add 18 New EV chargers to an existing parking lot. Provide a new EV electrical pad to power the new EV chargers and provide a pad based transformer to provide upgraded power to the (2) existing buildings. This work will require electrical trenching for EV and electrical service upgrades. New… | Master Electrician Frank A Horvath | $60K | |
#ELEC25-9663940 ELECTRICAL Provide a 5’X10’ concrete pad with (10) bollards, trenching for underground conduits, and (9) concrete EV Charger bases per print and SOW. Install CT Cabinet, 400A 208V 3PH fused disconnect switch, and 400A 208V 3PH Panel. Furnish and install conduit and wire for above, CT conduit to be stubbed… | Sean Trask | $43K | |
#ELEC25-9662640 ELECTRICAL Install (2) new 200 amp 3phase electrical panels in each building to supply power for previously installed geo thermal equipment. Provide branch wiring for all previously installed geo thermal equipment. Existing geo thermal equipment will be powered by the existing electrical service until… | Master Electrician Frank A Horvath | $20K | |
#ELEC25-9656428 ELECTRICAL · MASTER ELECTRICIAN There are (2) separate buildings located on one parcel (1106-1110 Main street). The scope of work is the same for both buildings. Each building to receive a new 100 amp electrical service to provide power for HVAC system and centralized hot water system. Power will also be provided to each new geo… | Master Electrician Frank A Horvath | $40K | |
#REP25-9646258 REP-PLANS · LIGHT COMMERCIAL CONTRACTOR There are (2) separate buildings located on one parcel (1106-1110 Main street). The scope of work is the same for both buildings. Remove and replace the existing windows, HVAC system and centralized hot water system. Provide a new fully electrical geothermal heating/cooling system with integrated… | Eric Winstanley | $300K | |
#GC25-9631476 GC · LIGHT COMMERCIAL CONTRACTOR Add 18 New EV chargers to an existing parking lot. Provide a new EV electrical pad to power the new EV chargers and provide a pad based transformer to provide upgraded power to the (2) existing buildings. This work will require electrical trenching for EV and building service upgrades. After… | Eric Winstanley | $80K | |
#ELEC24-9624218 ELECTRICAL · MASTER ELECTRICIAN Provide electrical service upgrade to provide power for 9 Electric vehicle chargers within an existing parking lot. | Joseph Sapienza | $80K |