Issued Dec 19
$500K
ESO #302 776 33 LIGHTING, RECEPTACLES, BRANCH CIRCUITS AND SERVICE
Get ProEvery project in every city · from $79/mo
Get ProMonthly permit report
By declared value.
Issued Dec 19
$500K
ESO #302 776 33 LIGHTING, RECEPTACLES, BRANCH CIRCUITS AND SERVICE
Issued Dec 23 · 2 permits
$305K
Install new lighting in the Produce department. disconnect power to equipment & refrigerated cases slated to be removed. connect power to new equipment & refrigerated cases
Issued Dec 26 · 2 permits
$191K
Source: building permit records from official city open-data portals, checked daily. Data through . How we count
Building addition and interior renovation to an existing lodging facility for Kevin Guest House. The addition is 3'-0" x 9'-6" or approx. 30 SF. The interior renovation includes…
Issued Dec 6
$100K
TO AN EXISTING 2 STORY MIXED USE BUILDING CREATE NEW FRONT FACADE,NEW WINDOWS ,AWNING, EXTERIOR LIGHTING. REPAIRS TO PARAPET, REPOINT BRICK, AND INSTALL NEW ROOFING SYSTEM…
Issued Dec 9 · 3 permits
$96.9K
Wire 2nd & 3rd floor apts/install new meter and sub feed at 2nd fl. First floor is commercial
Issued Dec 16
$68.1K
Tear off all existing layers, install EPDM peel and stick roofing system with new insulation board, seam tape, cover tape and all accessories. Flash all penetrations on the roof…
Issued Dec 18
$50K
( 157 GREAT ARROW AKA 261 GREAT ARROW ) EQUIPMENT UPGRADES AND INSTALLATION OF ( 3 ) ANTENNAS TO EXISTING ( CROWN CELL ) UNMANNED WIRELESS ROOFTOP COMMUNICATION SITE FOR " DISH…
Issued Dec 16
$38.5K
12SQ EPDM RUBBER 25SQ GRANULATED ROLLED ROOFING tear off all layers of stone and roof material. install 2.6' iso board on flat area only, glue down rubber on slight pitch…
Issued Dec 12 · 3 permits
$37.3K
*** PLANS FILED *** ALTERATIONS TO CREATE A NEW TOILET / SHOWER ROOM WITH LAUNDRY FACILITY IN THE REAR PORTION OF THE 1ST FLOOR DWELLING UNIT. *** ALL SEPARATE REQUIRED…
Issued Dec 3
$32K
9/30/24 - COMMISSIONER CONDEMNED DEMOLITION *** COMMISSIONER CONDEMNED EMERGENCY CONTROLLED DEMOLITION *** DEMOLISH TO GRADE A 2-STORY COMMERCIAL BUILDING. FUTURE LAND USE…
Other months: September 2026 · August 2026 · July 2026 · June 2026 · May 2026 · April 2026