Multifamily General Building, Electrical, Elevator work permitted October 20, 2025, with 3 permits through October 30, 2025.
Site of Saint Paul's College Modernize elevator #4. Replace Power Unit; Replace Controller; Replace Door Equipment; Replace fixtures.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Oct 20 – Oct 30, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#EA2600056 SHOP DRAWING · ELEVATOR - ALTERATION Site of Saint Paul's College Modernize elevator #4. Replace Power Unit; Replace Controller; Replace Door Equipment; Replace fixtures. Status: Permit Issued | Not published | — |
Commercial and multifamily, biggest first.
#E2600690 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2509309 CONSTRUCTION · ALTERATION AND REPAIR Site of Saint Paul's College ***FOR ELEVATOR REVIEW ONLY***INTERIOR WORK ONLY***REPAIR REPLACE THE FOLLOWING ITEMS IN THE E.M.R.***Replace (1) elevator mainline disconnect, Replace (1) cab light disconnect, Replace existing fluorescent fixtures in the machine room and pit with LED, Replace… Status: Permit Issued | Not published | — |