Multifamily Electrical, Solar work permitted December 8, 2025, with 3 permits through February 10, 2026.
This application is submitted as a revision to Solar Permit SOL2504230. The purpose of this revision is to reflect a change in the interconnection method. No changes are proposed to the approved structural design, electrical system, or equipment. All photovoltaic modules, inverters, and associated equipment remain unchanged in type, quantity, and specifications. The revisions associated with the interconnection method can be identified on the One-Line Diagram, sheet PV-4.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Dec 8 – Feb 10, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#SOL2601737 CONSTRUCTION · SOLAR SYSTEM This application is submitted as a revision to Solar Permit SOL2504230. The purpose of this revision is to reflect a change in the interconnection method. No changes are proposed to the approved structural design, electrical system, or equipment. All photovoltaic modules, inverters, and associated… |
Commercial and multifamily, biggest first.
Status: Permit Issued
| Not published |
| — |
#E2602924 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#SOL2504230 CONSTRUCTION · SOLAR SYSTEM Construction of a PV Roof-Mounted Solar System with a capacity of 53.24 kWp DC / 40.0 kW AC to be interconnected to the Pepco DC Grid Status: Permit Issued | Not published | — |