Commercial Fire Protection work permitted May 14, 2026, with 22 permits through September 11, 2026, declaring $326,475 of work.
Building 700 Removal and disposal of 1 existing layer of old roofing material down to the plywood decking. Re-nail any loose wood. Installed directly on the roof deck providing a secondary layer of protection from the elements, including rain, snow, and wind Self-adhesive underlayment applied along eaves and valleys protecting vulnerable areas on a roof from ice and water damage. Ice & Water will be installed for protection around vents, pipe boots, chimney, and skylights. Specialized fasteners for synthetic underlayment Designed in the popular architectural style, and made with…
Tacoma’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
22 permits issued May 14 – Sep 11, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jul 8 | #ESTRIP26-0038 ePermit · Strip Bldg Shop/Maintenance Removal and disposal of 1 existing layer of old roofing material down to the plywood decking. Re-nail any loose wood. Installed directly on the roof deck providing a secondary layer of protection from the elements, including rain, snow, and wind Self-adhesive underlayment… |
Commercial and multifamily, biggest first.
Status: Finaled
| Not published |
| $6.7K |
| applied Jul 8 | #ESTRIP26-0037 ePermit · Strip Bldg 1400 Removal and disposal of 1 existing layer of old roofing material down to the plywood decking. Re-nail any loose wood. Installed directly on the roof deck providing a secondary layer of protection from the elements, including rain, snow, and wind Self-adhesive underlayment applied along… Status: Finaled | Not published | $23.4K |
| applied Jul 8 | #ESTRIP26-0036 ePermit · Strip Bldg 1500 Removal and disposal of 1 existing layer of old roofing material down to the plywood decking. Re-nail any loose wood. Installed directly on the roof deck providing a secondary layer of protection from the elements, including rain, snow, and wind Self-adhesive underlayment applied along… Status: Finaled | Not published | $45.5K |
| applied Jul 8 | #ESTRIP26-0035 ePermit · Strip Bldg 1700 Removal and disposal of 1 existing layer of old roofing material down to the plywood decking. Re-nail any loose wood. Installed directly on the roof deck providing a secondary layer of protection from the elements, including rain, snow, and wind Self-adhesive underlayment applied along… Status: Finaled | Not published | $23.4K |
| applied Jul 8 | #ESTRIP26-0034 ePermit · Strip Bldg 1800 Removal and disposal of 1 existing layer of old roofing material down to the plywood decking. Re-nail any loose wood. Installed directly on the roof deck providing a secondary layer of protection from the elements, including rain, snow, and wind Self-adhesive underlayment applied along… Status: Finaled | Not published | $23.4K |
| applied Jul 8 | #ESTRIP26-0033 ePermit · Strip Bldg 2000 Removal and disposal of 1 existing layer of old roofing material down to the plywood decking. Re-nail any loose wood. Installed directly on the roof deck providing a secondary layer of protection from the elements, including rain, snow, and wind Self-adhesive underlayment applied along… Status: Finaled | Not published | $24.1K |
| applied Jul 8 | #ESTRIP26-0031 ePermit · Strip Bldg 2200 Removal and disposal of 1 existing layer of old roofing material down to the plywood decking. Re-nail any loose wood. Installed directly on the roof deck providing a secondary layer of protection from the elements, including rain, snow, and wind Self-adhesive underlayment applied along… Status: Finaled | Not published | $38.4K |
| applied Jul 8 | #ESTRIP26-0032 ePermit · Strip Bldg 2100 Removal and disposal of 1 existing layer of old roofing material down to the plywood decking. Re-nail any loose wood. Installed directly on the roof deck providing a secondary layer of protection from the elements, including rain, snow, and wind Self-adhesive underlayment applied along… Status: Finaled | Not published | $29.3K |
| applied Jul 8 | #ESTRIP26-0029 ePermit · Strip Bldg 2300 Removal and disposal of 1 existing layer of old roofing material down to the plywood decking. Re-nail any loose wood. Installed directly on the roof deck providing a secondary layer of protection from the elements, including rain, snow, and wind Self-adhesive underlayment applied along… Status: Finaled | Not published | $29.3K |
| applied Jul 8 | #ESTRIP26-0030 ePermit · Strip Bldg 100 Removal and disposal of 1 existing layer of old roofing material down to the plywood decking. Re-nail any loose wood. Installed directly on the roof deck providing a secondary layer of protection from the elements, including rain, snow, and wind Self-adhesive underlayment applied along… Status: Finaled | Not published | $32.5K |
| applied Jul 8 | #ESTRIP26-0028 ePermit · Strip Bldg 300 Removal and disposal of 1 existing layer of old roofing material down to the plywood decking. Re-nail any loose wood. Installed directly on the roof deck providing a secondary layer of protection from the elements, including rain, snow, and wind Self-adhesive underlayment applied along… Status: Finaled | Not published | $22.8K |
| applied Jul 8 | #ESTRIP26-0027 ePermit · Strip Bldg 200 Removal and disposal of 1 existing layer of old roofing material down to the plywood decking. Re-nail any loose wood. Installed directly on the roof deck providing a secondary layer of protection from the elements, including rain, snow, and wind Self-adhesive underlayment applied along… Status: Finaled | Not published | $23.4K |
| applied Jun 26 | #ESTRIP26-0025 ePermit · Strip Building 500 Removal and disposal of 1 existing layer of old roofing material down to the plywood decking. Re-nail any loose wood. Installed directly on the roof deck providing a secondary layer of protection from the elements, including rain, snow, and wind Self-adhesive underlayment applied… Status: Finaled | Not published | $24.1K |
| applied Jun 24 | #ESTRIP26-0024 ePermit · Strip Spanish Hills Bldg 600 Building 700 Removal and disposal of 1 existing layer of old roofing material down to the plywood decking. Re-nail any loose wood. Installed directly on the roof deck providing a secondary layer of protection from the elements, including rain, snow, and wind Self-adhesive… Status: Finaled | Not published | $23.4K |
| applied Jun 22 | #ESTRIP26-0023 ePermit · Strip Building 400 Removal and disposal of 1 existing layer of old roofing material down to the plywood decking. Re-nail any loose wood. Installed directly on the roof deck providing a secondary layer of protection from the elements, including rain, snow, and wind Self-adhesive underlayment applied… Status: Finaled | Not published | $31.2K |
| applied Jun 12 | #ESTRIP26-0022 ePermit · Strip Building 800 Removal and disposal of 1 existing layer of old roofing material down to the plywood decking. Re-nail any loose wood. Installed directly on the roof deck providing a secondary layer of protection from the elements, including rain, snow, and wind Self-adhesive underlayment applied… Status: Finaled | Not published | $24.1K |
| applied Jun 9 | #ESTRIP26-0019 ePermit · Strip Building 700 Removal and disposal of 1 existing layer of old roofing material down to the plywood decking. Re-nail any loose wood. Installed directly on the roof deck providing a secondary layer of protection from the elements, including rain, snow, and wind Self-adhesive underlayment applied… Status: Finaled | Not published | $46.8K |
| applied May 29 | #ESTRIP26-0016 ePermit · Strip Removal and disposal of 1 existing layer of old roofing material down to the plywood decking. Re-nail any loose wood. Installed directly on the roof deck providing a secondary layer of protection from the elements, including rain, snow, and wind Self-adhesive underlayment applied along eaves and… Status: Finaled | Not published | $23.4K |
| applied May 29 | #ESTRIP26-0015 ePermit · Strip Removal and disposal of 1 existing layer of old roofing material down to the plywood decking. Re-nail any loose wood. Installed directly on the roof deck providing a secondary layer of protection from the elements, including rain, snow, and wind Self-adhesive underlayment applied along eaves and… Status: Finaled | Not published | $23.4K |
| applied May 28 | #ESTRIP26-0014 ePermit · Strip Removal and disposal of 1 existing layer of old roofing material down to the plywood decking. Re-nail any loose wood. Installed directly on the roof deck providing a secondary layer of protection from the elements, including rain, snow, and wind Self-adhesive underlayment applied along eaves and… Status: Finaled | Not published | $24.1K |
| applied May 14 | #ESTRIP26-0010 ePermit · Strip Removal and disposal of 1 existing layer of old roofing material down to the plywood decking. Re-nail any loose wood. Installed directly on the roof deck providing a secondary layer of protection from the elements, including rain, snow, and wind Self-adhesive underlayment applied along eaves and… Status: Finaled | Not published | $29.3K |
| applied May 14 | #ESTRIP26-0011 ePermit · Strip Removal and disposal of 1 existing layer of old roofing material down to the plywood decking. Re-nail any loose wood. Installed directly on the roof deck providing a secondary layer of protection from the elements, including rain, snow, and wind Self-adhesive underlayment applied along eaves and… Status: Finaled | Not published | $26K |