Multifamily Elevator, Fire Protection, Hvac/Mechanical work permitted April 1, 2025, with 3 permits through February 27, 2026, declaring $91,683 of work. Contractor on record: Trotter & Morton.
a like for like replacement, remove and replace existing boiler with new, MBTUH remains the same, same manufacturer no changes to electrical or mains or controls. Future decarbonization plan required before final inspection.
Seattle permit records name Trotter & Morton and Tke as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
3 permits issued Apr 1 – Feb 27, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Oct 30 |
Commercial and multifamily, biggest first.
#7114417-FS
Fire Sprinkler and Suppression · Trade
Replace existing in line vertical fire pump. Like for like replacement.
Status: Completed
| Not published |
| $29K |
#7076195-BP Boiler/Pressure Vessel · Trade a like for like replacement, remove and replace existing boiler with new, MBTUH remains the same, same manufacturer no changes to electrical or mains or controls. Future decarbonization plan required before final inspection. Status: Issued | Trotter & Morton | $54.4K |
| applied Apr 1 | #7078434-CY Conveyance · Trade Install two door edges, both rear and front opening-1354446 CON:6440 US:131214 RO:4820777 EQP-SI-06418 / EQP-CY-04701 (2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1) Status: Completed | Tke | $8.2K |