Get ProEvery project in every city · from $79/mo
Get Procommercial project · Seattle, WA
Commercial Electrical, Fire Protection, Roofing work permitted November 5, 2024, with 14 permits through October 20, 2026, declaring $398,042 of work. Contractor on record: CTS.
Roof overlay with new 60mil fleeceback membrane
Seattle permit records name CTS, Holaday Parks Inc and Columbia Fire as the contractors on this project, among 7 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 3 permits issued in the last 30 days is included with Pro.
See the contractor14 permits issued Nov 5 – Oct 20, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#7168272-EL Electrical · Electrical Installation of power and receptacles for work stations. Status: Issued | Contractor with Pro | — | |
#7168321-EL Electrical · Electrical 442235 Union Station - (1) modified 120v circuit (1) LV Access Control device. Status: Issued | Contractor with Pro | — | |
| applied Oct 6 | #7165988-EL Electrical · Electrical Removing a pre-action panel and associated secondary system that was protecting a server room that has be removed and no longer needed. All devices for this secondary system will be moved and outlets blanked off. The existing horn strobes that are on the main building system will remain. Status: Issued | Contractor with Pro | $6K |
#7139367-FS Fire Sprinkler and Suppression · Trade Remove pre-action system on the 2nd floor that is no longer needed since tenant moved out. Existing piping for the pre-action system remain and will be connected to the over head system for the floor. Fire alarm permit will separate. Status: Ready For Issuance | Columbia Fire | $5.1K | |
#7118649-EL Electrical · Electrical Supply and install 4pr UTP Cat6A cable from appropriate IDF to each WAP location. Installation of WAPs will be installed at the pre-approved locations from the survey. Mount the access points securely, ensuring minimal obstruction to signal strength and compliance with safety standards. Ensure… Status: Issued | CTS | $8.5K | |
#7118145-EL Electrical · Electrical We will be connecting 15 whips to the cubicles as part of the furniture installation. Please note the following technical requirements: Telecommunications cabling will be separate, with no PoE. The 110 drops are data-only. You may contact me at 562-475-6253 with any questions. Parking is… Status: Completed | Not published | $20K | |
#7117810-EL Electrical · Electrical Installation of [012] new data CATEGORY 6 cables to [006] conference room TV locations. Status: Completed | CTS | $12K | |
#7106213-RR Roof · Roof Roof overlay with new 60mil fleeceback membrane Status: Completed | Commerical Industrial Roofing | $321K | |
#7102598-EL Electrical · Electrical 2501519 - Miller Nash Service Work - Installing (3) Quad Receptacles. Status: Completed | Titan Electric Inc | $5K | |
#7093064-EL Electrical · Electrical Installation of a cellular dialer Status: Completed | Not published | $500 | |
#7090455-EL Electrical · Electrical 9th Floor Miller Nash. LV Energy Management, 4 Devices Status: Completed | Holaday Parks Inc | $2K | |
#7057067-EL Electrical · Electrical Install modular furniture (power wiring by others). Status: Completed | SES, Inc | $2.2K | |
#7055682-EL Electrical · Electrical low voltage work for installation of access control/gates, and video surveillance system Status: Closed | Everon LLC | $15.9K | |
#7054860-EL Electrical · Electrical LV Energy Management Controls Installation, 4 Devices. Status: Completed | Holaday Parks Inc | $2K |
In Seattle, biggest first.