Multifamily Electrical work permitted December 6, 2024, with 15 permits through October 1, 2026, declaring $175,618 of work. Contractor on record: Entrance Controls Inc.
Seattle permit records name Entrance Controls Inc, Energy Flow Electric and Titan Electric Inc as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 1 permit issued in the last 30 days is included with Pro.
See the contractor15 permits issued Dec 6 – Oct 1, newest first.
| Issued |
|---|
Commercial and multifamily, biggest first.
| Permit |
|---|
| Contractor |
|---|
| Value |
|---|
#7165326-EL Electrical · Electrical (1) 15amp circuit for fire place insert Status: Completed | Contractor with Pro | — | |
| applied Aug 10 | #7157078-EL Electrical · Electrical Rip and Replacing (36) Level-2 Dual-Port and Single-Port Chargers and Replacing them with (57) New Level-2 Chargers. A Total of (29) in South Tower and (28) in North Tower. 7 existing stalls will be decommissioned and junction boxes will be installed in it place. [8/19/26 KEF - Plan set approved.] Status: Completed | Not published | $49.5K |
#7157426-EL Electrical · Electrical I'm adding an EV Charger Status: Completed | Not published | — | |
#7152194-EL Electrical · Electrical 26084 - INSIGNIA CONDOS STAIRWELL - INSTALL CARD ACCESS Status: Issued | Entrance Controls Inc | — | |
#7143360-EL Electrical · Electrical I'm adding an EV Charger Status: Completed | Not published | — | |
#7137070-EL Electrical · Electrical We are installing (1) cell dialer for fire alarm monitoring Status: Issued | Not published | — | |
| applied Jan 28 | #7126885-EL Electrical · Electrical Installation of (1) EV charger on existing EV Panels [3/25/26 KEF - Plan set conditionally approved pending completion of permit 7049772-EL.] Status: Completed | Not published | $4.4K |
#7134600-EL Electrical · Electrical 41663 PERFORM GENERATGRO LOAD BANK Status: Completed | Not published | — | |
#7101973-EL Electrical · Electrical add some plugs in the office and install smart plugs Status: Completed | Energy Flow Electric | $4K | |
| applied Aug 4 | #7099758-EL Electrical · Electrical Installation of (1) Wallbox Level 2 charger on existing EV infrastructure. [8/11/25 KEF - Plan set approved.] Status: Completed | Not published | $4.8K |
#7084454-EL Electrical · Electrical PERFORM GENERATOR LOAD BANK Status: Completed | Not published | $500 | |
#7073225-EL Electrical · Electrical Job #2511072 - Installing GFCI for bathroom bidet and installing grommet for power cord to pass through built ins Status: Completed | Titan Electric Inc | $2.4K | |
| applied Dec 13 | #7060886-EL Electrical · Electrical Installation of (1) Wallbox PUP2 Electric Vehicle Charging Stations in deeded stalls. Pulling power from existing panels with power management. [12/16/24 - BGO Fee OK; Approved EVSE Plan. (1) EVSE in South Tower under cloned permit 7061253-EL] Mark Fox - Unit Number 2203N - North Tower - 389/390;… Status: Completed | Not published | $10K |
| applied Jan 1 | #7061253-EL Electrical · Electrical Installation of (1) Wallbox PUP2 Electric Vehicle Charging Stations in deeded stalls. Pulling power from existing panels [12/16/24 BGO - Fee OK, paid under permit 7060886-EL. Plan review waived for single EVSE in dedicated EV panel] Jessica Ng - Unit Number 2607S - South Tower - 292/293; [3/3/26… Status: Completed | Not published | — |
#7059735-EL Electrical · Electrical Replacement of existing ERRCS DAS system Status: Completed | Skyline Communications | $100K |