Commercial Electrical, Elevator work permitted December 19, 2024, with 4 permits through July 1, 2026, declaring $22,810 of work. Contractor on record: Moore Elevator Company, LLC.
Installation of New Vertical Platform Lift. EQP-SI-09420 (Replacing existing unit at location / separate permit for removal) 2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1
Seattle permit records name Moore Elevator Company, LLC, CTR Electric, Inc. and Mastercraft Electric, Inc. as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
4 permits issued Dec 19 – Jul 1, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#7150866-EL Electrical · Electrical TI to install: 3 - 2p 20a (One Per Station) 2 - 2p 25a (Heater Circuits) 2-3 - 20a GP Circuits for around the warehouse. 1 - 3p 20a (Forklift Charger) Status: Issued |
| CTR Electric, Inc. |
| — |
| applied Aug 7 | #7100385-CY Conveyance · Trade Removal of Old Vertical Platform Lift EQP-SI-09420 / EQP-CY-08778 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | Moore Elevator Company, LLC | $1.5K |
| applied Jul 28 | #7098387-CY Conveyance · Trade Installation of New Vertical Platform Lift. EQP-SI-09420 (Replacing existing unit at location / separate permit for removal) 2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1 Status: Completed | Moore Elevator Company, LLC | $19.3K |
#7061918-EL Electrical · Electrical Install (1) Sub Meter & associated CT's Status: Completed | Mastercraft Electric, Inc. | $2K |