Commercial General Building, Electrical, Elevator, Fire Protection, Hvac/Mechanical work permitted June 13, 2025, with 8 permits through January 29, 2026, declaring $314,034 of work. Contractor on record: CTR Electric, Inc..
Construct alterations in NW portion of existing commercial building per plan.
Seattle permit records name CTR Electric, Inc., Moore Elevator Company, LLC and Mechanical & Control Services as the contractors on this project, among 5 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
8 permits issued Jun 13 – Jan 29, newest first.
| Issued |
|---|
Commercial and multifamily, biggest first.
| Permit |
|---|
| Contractor |
|---|
| Value |
|---|
| applied Oct 29 | #7109281-ME Mechanical · Trade Replace existing 4-ton Gas/electric roof top unit with new packaged gas/electric unit with economizer. Install new curb, supply and return drops through the roof, and thermostat, per plan. Status: Issued | Mechanical & Control Services | $12.5K |
| applied Jan 7 | #7122030-ME Mechanical · Trade Alterations to mechanical system on existing commercial building, per plans. Status: Completed | Pacific Air Control Inc | $10.8K |
#7123461-FS Fire Sprinkler and Suppression · Trade Modify existing overhead fire sprinkler system to accommodate new tenant walls & ceilings. Status: Completed | Archer Construction | $10.1K | |
#7119403-EL Electrical · Electrical Electrical alterations in NW portion of existing commercial building, per plan. Status: Completed | CTR Electric, Inc. | $28K | |
| applied Sep 3 | #7095152-CN Addition/Alteration · Building Construct alterations in NW portion of existing commercial building per plan. Status: Completed | Not published | $200K |
| applied Aug 7 | #7100388-CY Conveyance · Trade Removal of Old Vertical Platform lift EQP-SI-06581 / EQP-CY-07834 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | Moore Elevator Company, LLC | $1.5K |
| applied Jul 28 | #7098386-CY Conveyance · Trade Installation of New Vertical Platform Lift. EQP-SI-06581 (Replacing existing unit at location / separate permit for removal) 2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1 Status: Completed | Moore Elevator Company, LLC | $26.2K |
#7091107-EL Electrical · Electrical T.I. RELOCATE 125 AMP SUBPANEL OUT OF CLOSET AREA, DEMO AS NEEDED FOR WALL REMOVAL, R&R LIGHTING TO LED W/OCC SENSOR CONTROL, RELOCATE CIRCUITS & ADD 4 NEW. TB/ 8-5-25 Work is being completed in unit 6134 on Dev site address 6100. Status: Completed | CTR Electric, Inc. | $24.9K |