Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Seattle, WA
Multifamily Electrical, Elevator, Fire Protection, Hvac/Mechanical work permitted March 3, 2025, with 12 permits through October 20, 2026, declaring $10,962,321 of work. Contractor on record: Fire Protection Inc.
8 Story Residential, 22 Unit, L1 Amenity Space NFPA 13 Related Permits 6723708-CN 7010482-FS
Seattle permit records name Fire Protection Inc, Artline and Atlas Mechanical Inc as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 1 permit issued in the last 30 days is included with Pro.
See the contractorCommercial and multifamily, biggest first.
12 permits issued Mar 3 – Oct 20, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#7168259-EL Electrical · Electrical The fire sprinkler system needs the controllers to be changed to proper controllers. Shut down, replace, re-energize. Status: Issued | Contractor with Pro | — | |
#7156514-FS Fire Sprinkler and Suppression · Trade Addition of 1 sprinkler head in existing fire pump room, per City of Seattle direction. Job is finaled, so we need to pull and OTC permit Status: Completed | Not published | $1K | |
| applied Apr 30 | #7140847-EL Electrical · Electrical REVISION TO ISSUED PERMIT 7068420-EL : ADD SMOKE DETECTORS FOR ADDED FSDs ON THE MEZZANINE LEVEL. ENCLOSED ARE THE REVISED FIRE ALARM DRAWINGS FOR PERMIT 7068420-EL. THESE REVISIONS HAVE BEEN MADE TO INCORPORATE THE ADDITION OF FOUR FIRE SMOKE DAMPERS (FSDS) AND ONE EXHAUST FAN ON THE MEZZANINE… Status: Completed | Fire Protection Inc | $5K |
| applied Mar 9 | #7132455-CY Conveyance · Trade 7090870-CY (Original Installation Permit) 60 day temporary use permit valid from date signed by City of Seattle Elevator Inspector. Must have two way communication with operator at all times. Status: Issued | Artline | $500 |
| applied Jan 26 | #7126334-CY Conveyance · Trade Temp Use - Car#1 7090870-CY (Original Installation Permit) 60 day temporary use permit valid from date signed by City of Seattle Elevator Inspector. Must have two way communication with operator at all times. Status: Issued | Artline | $500 |
| applied Nov 13 | #7116578-FS Fire Sprinkler and Suppression · Trade 8 Story Residential, 22 Unit, L1 Amenity Space NFPA 13 Related Permits 6723708-CN 7010482-FS Status: Completed | Resolve General Construction | $10M |
| applied Jul 1 | #7079315-ME Mechanical · Trade Mechanical tenant improvement for a single building 7-stories above grade with 22 units of student housing and a total of 77 beds, per plans. Status: Completed | Not published | $290K |
| applied Jul 17 | #7096801-RF Refrigeration · Trade Multi Story Multi-Family Project with Split Systems Status: Completed | Atlas Mechanical Inc | $298K |
#7094013-EL Electrical · Electrical INSTALLATION OF A LOW VOLTAGE CCTV SYSTEM, ACCESS CONTROL SYSTEM AND ELEVATOR LOBBY 2-WAY COMMUNICATION SYSTEM. Status: Completed | Fire Protection Inc | $30K | |
| applied Jun 20 | #7090870-CY Conveyance · Trade new traction installation Elev 1 6723708-CN (2015 SBC=2017 SEC=2013 A17.1=2011 A18.1) Status: Completed | Artline | $223K |
| applied May 28 | #7088165-ME Mechanical · Trade The project will consist of a single building 7-stories above grade with 22 units of student housing with a total of 77 beds. This permit will only consist of ventilation of the apartments and level 7 public restroom. Only new equipment is ceiling exhaust fans. Status: Completed | Atlas Mechanical Inc | $39.6K |
| applied Feb 4 | #7068420-EL Electrical · Electrical INSTALLATION OF A FIRE ALARM SYSTEM WITH STAIR AND ELEVATOR PRESSURIZATION IN A NEW SEVEN-STORY THE FULLY SPRINKLED RESIDENTIAL BUILDING. A UUKL LISTED ADDRESSABLE FIRE ALARM CONTROL PANEL WILL BE INSTALLED IN THE 2HOUR-RATED STORAGE ROOM ON THE MEZZANINE LEVEL. A REMOTE FIRE ALARM ANNUNCIATOR AND… Status: Completed | Fire Protection Inc | $75K |
In Seattle, biggest first.