Get Procommercial project · Seattle, WA
Commercial Electrical, Elevator, Hvac/Mechanical work permitted November 22, 2024, with 18 permits through October 28, 2026, declaring $694,470 of work. Contractor on record: Eco Electric & Plumbing.
Get new commercial permits near 98105 or Seattle, free weekly email
Elevator modernization - replace controller, door operator, hall fixtures, car operating panel, machine, governor. Install 3D edge. EQP-SI-05612 / EQP-CY-03087 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1)
Seattle permit records name Eco Electric & Plumbing, Elevations Ltd and Empyrean dba Washington Elevator as the contractors on this project, among 10 contractors in all.
The contractor on 2 permits issued in the last 30 days is included with Pro.
See the contractorCommercial and multifamily, biggest first.
18 permits issued Nov 22 – Oct 28, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#7169661-EL Electrical · Electrical Boiler swap. Job #876708 Status: Issued | Contractor with Pro | — | |
#7167646-BP Boiler/Pressure Vessel · Trade Replaced the burner assembly and gas train with like for like replacement. Replaced blow down piping. Replaced condensate pump piping. Installed backflow preventor for make-up water. Status: Issued | Contractor with Pro | $34.4K | |
#7160794-EL Electrical · Electrical Installing (1) 20A disconnect circuit for chair lift Status: Completed | Eco Electric & Plumbing | — | |
| applied Jul 13 | #7152460-RF Refrigeration · Trade Install mini split system Status: Issued | Kliemann Bros Heating & A/C | $18K |
#7145437-EL Electrical · Electrical We need to establish a new fiber pathway between Wilsonian and Lothlorien via a concrete tunnel located between the properties. We will also install new network and cabling infrastructure in each building, including fiber between IDFs, racks and electronics in IDFs, snap-track/wire-mold pathways… Status: Completed | Burnham Network Solutions | — | |
| applied May 28 | #7144597-CY Conveyance · Trade Installing an inclined platform lift. EQP-SI-05612 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Status: Issued | Advantage Elevator Accessibility Systems Corp | $88K |
#7121421-EL Electrical · Electrical We are currently working on the commercial spaces, fitness room, equipment room, and updated bathrooms. The scope of work includes: Installing a new 200A panel, adding approximately (40) outlets, installing approximately (50) lights and adding lighting controls for the space. Status: Completed | Eco Electric & Plumbing | $50K | |
#7121011-EL Electrical · Electrical Installation of Access Control and CCTV for Study Room on L1, additionally we will be installing Access Control and CCTV for Fitness Room & Lounge on phase 2 Status: Issued | Skyline Communications | $40K | |
| applied Nov 4 | #7115177-CY Conveyance · Trade REMOVE FLOORING, WALL PANELS, AND CEILING INSTALL LVT FLOORING, LAMINATE WALL PANELS, AND SUSPENDED CEILING EQP-SI-05612 / EQP-CY-03087 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | Elevations Ltd | $19.1K |
| applied Nov 4 | #7115168-CY Conveyance · Trade EQP-SI-05612 / EQP-CY-03086 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) REMOVE EXISTING FLOOR, WALL PANELS, AND CEILING - INSTALL LVT FLOORING, LAMINATE WALL PANELS, AND SUSPENDED CEILING Status: Completed | Elevations Ltd | $19.1K |
#7107365-EL Electrical · Electrical We are working on what will be a future Study Hall, which will include (24) outlets, (25) light fixtures, (11) light switches, (3) exit signs Status: Completed | Eco Electric & Plumbing | $15K | |
| applied May 23 | #7087202-EL Electrical · Electrical Replacing Existing Conventional Silent Knight 5204 with Addressable Silent Knight 6820. Take over existing IDC's with Silent Knight SK-MON-10, 10 Zone Input Module. Install New addressable Smoke Detectors at each Elevator Landing for Personnel Elevators 1 & 2 and Elevator Machine Room. Install (1)… Status: Issued | Seacom Cabling Inc | $24K |
| applied Jun 12 | #7090867-CY Conveyance · Trade Elevator modernization - replace controller, door operator, hall fixtures, car operating panel, machine, governor. Install 3D edge. EQP-SI-05612 / EQP-CY-03087 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | Empyrean dba Washington Elevator | $300K |
| applied Jun 12 | #7090868-CY Conveyance · Trade Elevator modernization - replace controller, door operator, hall fixtures, car operating panel, machine, governor. Install 3D edge EQP-SI-05612 / EQP-CY-03086 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | Empyrean dba Washington Elevator | $300K |
#7090584-EL Electrical · Electrical Electrical upgrade to meet elevator code for elevator modernization. 6/15/2026 jnl renewal Status: Issued | Merit Electric, Inc. | $17K | |
#7083485-EL Electrical · Electrical Will be replacing a damaged feeder(175A) going to the 6th floor. Status: Completed | Eco Electric & Plumbing | $4K | |
| applied Jan 30 | #7068002-EL Electrical · Electrical Construct alterations to convert existing office spaces to amenity spaces and accessibility upgrades at first floor of mixed-use apartment building [WILSONIAN APARTMENTS], occupy per plan. Electrical scope. [1-31-25 DR - see 6482061-EL for drawings] [02/06/25 Approved Plan Set] [2-27-26 D Rankin -… Status: Closed | ecoserviceswa | $75K |
#7057841-EL Electrical · Electrical Will be installing (2) sub feeds 70A each, (16) 120V receptacles and (8) 120V switches Status: Completed | Eco Electric & Plumbing | $10K |