Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Seattle, WA
Multifamily General Building, Electrical, Elevator, Sign work permitted June 4, 2025, with 11 permits through October 2, 2026, declaring $530,000 of work. Contractor on record: Elevations Ltd.
Get new commercial permits near 98105 or Seattle, free weekly email
Complete and final for 6930048-CN subject to field inspection STFI
Seattle permit records name Elevations Ltd, Adt LLC and AAA Fire Protection as the contractors on this project, among 8 contractors in all.
11 permits issued Jun 4 – Oct 2, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#7165710-EL Electrical · Electrical Wireless security alarm installation. Status: Completed |
| Adt LLC |
| — |
#7164043-EL Electrical · Electrical Relocate fire alarm power supply and security system keypad to storage room wall. Relocate smoke detector base to above fire alarm power supply. Relocate fire alarm horn strobe to ceiling with proper mounting. Status: Completed | AAA Fire Protection | — |
| applied Jul 6 | #7150269-SB Sign, Awning and Canopy · Trade installation of one internally illuminated wall sign. 7/6/26 SS: Fees added for 1 sign circuit to include electrical on this permit. Status: Issued | Not published | $3.5K |
#7150872-EL Electrical · Electrical Basic ti clean up work. Demo few lights, install new devices as needed. No new circuits Status: Completed | Kurkov Electric LLC | — |
| applied Jun 5 | #7146753-CN Addition/Alteration · Building Construct tenant improvement to convert existing retail space into a bookstore subject to field inspection STFI. Status: Completed | Not published | $5K |
#7145438-EL Electrical · Electrical We need to establish a new fiber pathway between Wilsonian and Lothlorien via a concrete tunnel located between the properties. We will also install new network and cabling infrastructure in each building, including fiber between IDFs, racks and electronics in IDFs, snap-track/wire-mold pathways… Status: Completed | Burnham Network Solutions | — |
| applied Nov 4 | #7115210-CN Addition/Alteration · Building Complete and final for 6930048-CN subject to field inspection STFI Status: Issued | Dallas Legendre | $500K |
#7103720-EL Electrical · Electrical Installed (1) 15-20A circuit extension for Amazon Locker Status: Completed | Eco Electric & Plumbing | $1.5K |
| applied Jun 11 | #7090709-CY Conveyance · Trade Removing and installing cab interior. Such as floor, wall panels, and ceiling. EQP-SI-07910 / EQP-CY-06821 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | Elevations Ltd | $20K |
| applied Jun 11 | #7090715-CY Conveyance · Trade Removing and installing cab interior. Such as floor, wall panels, and ceiling. EQP-SI-07910 / EQP-CY-06822 (2021 SBC=2019 A17.1=2023 NEC/SEC=2020 A18.1) Status: Completed | Elevations Ltd | $20K |
| applied Jun 4 | #7088316-SB Sign, Awning and Canopy · Trade Install one illuminated wall sign. 6/4/25 SS: Fees added for 1 sign circuit to include electrical on this permit. 6/26/25 SS: Replacement green electrical sign permit sticker issued. 11/5/25 SS: Revised plans received. Revision fee waived. Revision approved. Status: Issued | Berry Sign | $5K |
In Seattle, biggest first.