Commercial Electrical, Elevator, Fire Protection, Sign work permitted March 6, 2025, with 11 permits through April 7, 2026, declaring $525,310 of work. Contractor on record: Kone Inc (Primary).
Temp Use - Elev. #1 7099153-CY (Installation Permit) 60-day temp use permit valid from date signed by City of Seattle elevator inspector. Must have two-way communication with operator at all times.
Seattle permit records name Kone Inc (Primary), Rob's Electric Inc and G B Systems Inc as the contractors on this project, among 6 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
11 permits issued Mar 6 – Apr 7, newest first.
| Issued | Permit | Contractor |
|---|
Commercial and multifamily, biggest first.
| Value |
|---|
#7137098-EL Electrical · Electrical Adding Cellular Communicator to Fire Alarm System being installed by Robs Electric on Permit # 7049032-EL Status: Issued | Not published | — | |
| applied Jan 27 | #7125686-SB Sign, Awning and Canopy · Trade Double Sided illuminated blade joint venture with Heath NW. 1/27/26 SS: Fees added for 1 sign circuit to include electrical on this permit. Status: Completed | Artco Sign Co. Inc | $6.5K |
| applied Nov 3 | #7114887-CY Conveyance · Trade Temp Use - Elev. #1 7099153-CY (Installation Permit) 60-day temp use permit valid from date signed by City of Seattle elevator inspector. Must have two-way communication with operator at all times. Status: Issued | Kone Inc (Primary) | $244K |
#7108884-EL Electrical · Electrical TEMP POLE #3 FOR MIXED USE BUILDING Status: Completed | Rob's Electric Inc | $350 | |
#7101643-EL Electrical · Electrical 1605 S Jackson: Install (36) wired thermostats for residential split systems Status: Completed | G B Systems Inc | $7.2K | |
| applied Jul 22 | #7097169-EL Electrical · Electrical Installation of 16.15 KW AC of solar system on new commercial construction [7/31/2025 BGO - Approved PV Plan Set] [8/11/2025 BGO - Approved Revised Plan Set] [9/24/25 BGO - Approved Second Revision]***[C.Kenefick 4/28/2026 - Address on permit is correct. This is a corner propery.] Status: Completed | Solterra Global LLC | $19.2K |
| applied Jul 31 | #7099153-CY Conveyance · Trade Install new traction elevator - car #1 6878364-CN (Construction Permit) 2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1 Status: Completed | Kone Inc (Primary) | $244K |
#7091503-EL Electrical · Electrical Access control and security cameras. Main Entrance intercom. Wi-Fi Status: Completed | Not published | $40K | |
| applied Oct 3 | #7049032-EL Electrical · Electrical FIRE ALARM FOR 37 UNIT MIXED USE [10-22-24 DR - Contractor ask to hold on review until 10-30-24 and allow them to upload new plan set. Mick Arnes 206-300-7200] Status: Completed | Rob's Electric Inc | $30.5K |
| applied Jan 6 | #7063389-FS Fire Sprinkler and Suppression · Trade Install fire sprinkler system throughout new 6-story mixed-use building with 37 residential apartments, 2100 SF of commercial and parking for 15 vehicles below grade. Manual dry standpipes in both stairwells. Status: Completed | Pye-Barker Fire and Safety | $176K |
#7074013-EL Electrical · Electrical 1605 S Jackson Add (3) thermostats and (4) CO, NO2 sensors.; [3/10/26 RN Renewal/Reinstatement fee added] Status: Completed | G B Systems Inc | $1.8K |
In Seattle, biggest first.