Multifamily Electrical work permitted February 10, 2025, with 2 permits through June 10, 2026. Contractor on record: The Safety Team, Inc..
Replace existing fire alarm panel with new fire alarm panel in the same location, utilizing existing wiring. Install new cellular monitoring panel.
Seattle permit records name The Safety Team, Inc. and Northwest Electric & Solar as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
2 permits issued Feb 10 – Jun 10, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#7147429-EL Electrical · Electrical Replace existing fire alarm panel with new fire alarm panel in the same location, utilizing existing wiring. Install new cellular monitoring panel. |
Commercial and multifamily, biggest first.
Status: Issued
| The Safety Team, Inc. |
| — |
#7069743-EL Electrical · Electrical 13744 Stonewater HOA Raceway - Inside electrical room core drill 4 -1 ¼ hole into parking garage. - Install 4-1 ¼ EMT conduits. - Install J boxes on each side of the wall. Status: Completed | Northwest Electric & Solar | — |
In Seattle, biggest first.