Get Procommercial project · Seattle, WA
Commercial General Building, Electrical, Elevator, Fire Protection, Hvac/Mechanical work permitted November 22, 2024, with 21 permits through July 30, 2026, declaring $2,197,646 of work. Contractor on record: Cochran, Inc..
Construct tenant improvements at 5th level cafeteria/dining area of mixed-use commercial building [STONE 34 - BROOKS HQ] per plan.
Seattle permit records name Cochran, Inc., McKinstry Co LLC and Artline as the contractors on this project, among 7 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
21 permits issued Nov 22 – Jul 30, newest first.
| Issued | Permit |
|---|
Commercial and multifamily, biggest first.
| Contractor |
|---|
| Value |
|---|
#7155783-EL Electrical · Electrical Boiler controls upgrade. EC job 836959 Status: Completed | EC Electric | — | |
| applied May 13 | #7139714-ME Mechanical · Trade Replace (1) existing boiler and (2) existing water heaters with air-to-water heat pumps per plans Status: Issued | Not published | $580K |
#7147648-EL Electrical · Electrical Demo any power to boiler BR-2 (keep BR-1 in place for backup) - Install (1) 300A 480V 3P breaker in panel MPR-3 - Install 300A wire and conduit from MPR-3 to new rooftop air source heat pump ASHP-1 - Install 400A 3R rated disconnect next to or on ASHP-1 with 300A fuses and make connection to… Status: Issued | Cochran Inc. | — | |
| applied May 21 | #7144363-RF Refrigeration · Trade Installation of a 3.5T Split System for climate control in a new testing chamber. Status: Completed | McKinstry Co LLC | $15K |
#7142700-EL Electrical · Electrical Adding receptacles, lights and sensors to a prefab environmental chamber. [7/31/2026 PGF Voided all fees and added admin fee, (6) 15-30A branch circuit/feeder, and (1) 35-60A branch circuit/feeder, and post-issuance change fees to permit.] Status: Completed | Exact Electric, LLC | — | |
#7139648-EL Electrical · Electrical Install 480v transformer and 120\208v panel for and environmental chamber. Status: Completed | McKinstry Co LLC | — | |
#7136851-FS Fire Sprinkler and Suppression · Trade Tenant improvement involving 1 sprinkler head Status: Completed | McKinstry Co. LLC | $2.7K | |
| applied Mar 5 | #7125167-ME Mechanical · Trade Installation of a condensing unit and associated piping to support a stability chamber. Status: Completed | McKinstry Co LLC | $17.4K |
#7127621-EL Electrical · Electrical Status: Completed | Cochran, Inc. | — | |
#7126311-EL Electrical · Electrical Status: Issued | Cochran, Inc. | — | |
#7122194-EL Electrical · Electrical Install (1) Cat 6 Cable to (3) Locations Status: Completed | Cochran, Inc. | $3.2K | |
#7120335-EL Electrical · Electrical Adding receptacles for TV - Job 528948 Status: Completed | Cochran Inc | $6K | |
#7110749-EL Electrical · Electrical Install (1) Cat 6 cable and (1) electrical receptacle to (1) location Status: Completed | Cochran, Inc. | $4K | |
#7069240-EL Electrical · Electrical RELOCATE (3) FIRE ALARM DEVICES. JOB # 830339. PM IS MOLLY PRICE 360.801.1052 Status: Completed | Veca Electric & Technologies, LLC | $1K | |
| applied Feb 5 | #7067090-ME Mechanical · Trade ** STFI ** Installation of new ductwork and diffusers and relocate existing diffusers. Status: Completed | McKinstry Co LLC | $39K |
| applied Jan 6 | #7063180-FS Fire Sprinkler and Suppression · Trade TENANT IMPROVEMENT - ADD, RELOCATE AND PLUG SPRINKLERS FOR TI WALLS AND CEILINGS Status: Completed | Patriot Fire Protection Inc | $9.9K |
#7060764-EL Electrical · Electrical BROOKS CAFE TENANT IMPROVEMENT. JOB # 830339. PM IS MOLLY PRICE 360.801.1052 [4/3/2025 PGF Added (6) 20A dedicated appliance circuits, (1) 30A dedicated appliance circuit, and (1) 60A feeder to permit per contractor email request (Molly). Post-issuance change fee included.] Status: Completed | Veca Electric & Technologies, LLC | $70K | |
| applied Dec 11 | #7060361-CY Conveyance · Trade Otis is only applying for the permit. Unico is replacing the flooring in the elevator. EQP-SI-08836 / EQP-CY-07988 (2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1) Status: Completed | Artline | $105 |
| applied Dec 11 | #7060362-CY Conveyance · Trade Otis is only applying for the permit. Unico is replacing the flooring in the elevator. EQP-SI-08836 / EQP-CY-07989 (2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1) Status: Issued | Artline | $105 |
| applied Dec 11 | #7060360-CY Conveyance · Trade Otis is only applying for the permit. Unico is replacing the flooring in the elevator. EQP-SI-08836 / EQP-CY-07987 (2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1) Status: Completed | Artline | $105 |
| applied Aug 23 | #7037411-CN Addition/Alteration · Building Construct tenant improvements at 5th level cafeteria/dining area of mixed-use commercial building [STONE 34 - BROOKS HQ] per plan. Status: Completed | Not published | $1.4M |