Multifamily Electrical, Roofing work permitted March 27, 2025, with 4 permits through September 1, 2026, declaring $178,000 of work. Contractor on record: Mauro Electric Inc.
Remove existing asphalt shingles down to the existing roof substrate remove all membrane replace damaged plywood as needed. On steep slope we will install underlayment ice and water shield and shingles. On the low slope sections we will install 1/2" densdeck coverboard and 60mil TPO membrane
Seattle permit records name Mauro Electric Inc and Preferred Roof Services as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
4 permits issued Mar 27 – Sep 1, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#7160867-RR Roof · Roof |
Commercial and multifamily, biggest first.
Remove existing asphalt shingles down to the existing roof substrate remove all membrane replace damaged plywood as needed. On steep slope we will install underlayment ice and water shield and shingles. On the low slope sections we will install 1/2" densdeck coverboard and 60mil TPO membrane
Status: Issued
| Preferred Roof Services |
| $173K |
#7112305-EL Electrical · Electrical add/alter 2 circuits Status: Completed | Mauro Electric Inc | $2K |
#7082197-EL Electrical · Electrical bathroom remodel Status: Completed | Mauro Electric Inc | $3K |
#7077813-EL Electrical · Electrical Add/alter circuits for washer and dryer connections Status: Completed | Mauro Electric Inc | $3K |