Get Promultifamily project · Seattle, WA
Multifamily General Building, Electrical work permitted February 9, 2026, with 2 permits through July 20, 2026, declaring $113,700 of work. Contractor on record: Milne Electric.
Disconnect a total of 4 feeders to two docks and reconnect with flexible cable so that Waterfront Construction can replace the bulkhead. Then install conduit, wire, and junctions to restore power back to the docks. Disconnect and reconnect existing fire alarm in a similar fashion. [2/9/26 BGO - Approved Plan Set]
Seattle permit records name Milne Electric as the contractor on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
2 permits issued Feb 9 – Jul 20, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jun 29 | #7131349-CN Addition/Alteration · Building Construct alterations to existing pier per plan. |
Commercial and multifamily, biggest first.
Status: Issued
| Not published |
| $25K |
| applied Jan 9 | #7124275-EL Electrical · Electrical Disconnect a total of 4 feeders to two docks and reconnect with flexible cable so that Waterfront Construction can replace the bulkhead. Then install conduit, wire, and junctions to restore power back to the docks. Disconnect and reconnect existing fire alarm in a similar fashion. [2/9/26 BGO -… Status: Issued | Milne Electric | $88.7K |