Commercial Electrical work permitted January 5, 2026, with 3 permits through August 12, 2026, declaring $77,000 of work. Contractor on record: Titan Electric Inc.
Get new commercial permits near 98106 or Seattle, free weekly email
Provide and install (1) 600A and (1) 300A breaker in main switchgear. 480V system Provide and install (1) 600A feed from new breaker to 600A branch panelboard. Parallel feeders, ~175' from switchgear to panelboard. Provide and Install (1) 600A NEMA-4X panelboard in production floor. Eaton PRL3X panelboard fully rated, 600A MB. Provide and install (1) 300A feed from main switchgear to ceiling mounted Jbox on production floor. Job#:2621107 [8/12/26 KEF - Plan set approved.]
Seattle permit records name Titan Electric Inc and McKinstry Co LLC as the contractors on this project.
3 permits issued Jan 5 – Aug 12, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 3 | #7156237-EL Electrical · Electrical |
Commercial and multifamily, biggest first.
Provide and install (1) 600A and (1) 300A breaker in main switchgear. 480V system Provide and install (1) 600A feed from new breaker to 600A branch panelboard. Parallel feeders, ~175' from switchgear to panelboard. Provide and Install (1) 600A NEMA-4X panelboard in production floor. Eaton…
Status: Completed
| Titan Electric Inc |
| $77K |
#7132915-EL Electrical · Electrical Procure custom control panel w/ built in step-down transformer Scan concrete around hi-core pit and to waste manhole prior to sawcutting Sawcut concrete from nearby connex to the waste manole and the front of the hi-core pit for conduit routing Core drill hole into waste manhole for Install… Status: Completed | McKinstry Co LLC | — |
#7123556-EL Electrical · Electrical Status: Issued | Not published | — |